
Chapter 2: Intermediate Platform
9. Install the two platform stiffening straps (16) to the outside handrail kick braces (15) with flange bolts
(2) and flange nuts (3).
Figure 2-17
Installing the platform stiffening strips for second platform
2
5/16 x 3/4 in. flange bolt (S-6606)
15
Outside handrail kick brace (WBS-0020)
3
5/16 in. flange nut (S-3611)
16
Platform stiffening strap (WBS-0083)
10.Tighten and level the handrail posts (9).
11.Tighten the outside handrail kick braces (15) and the platform stiffening straps (16).
30
PNEG-2077
TopDry – Platforms and Bin Stairs