
Assembling the Eave Platform
The eave platform is made of two 3–panel platform that are installed separately onto the sidewall and
spliced together by a platform splice.
Assembling the First Platform Section
1. Assemble the four intermediate support angles (5), outside support angles (6) and platform floor pan
(7) together with sixteen truss head bolts (1) and sixteen flange nuts (3).
IMPORTANT:
Arrange the intermediate support angles (5) as shown (A).
NOTE:
Tighten the truss head bolts (1) before the platform floor is installed to the bin.
Figure 5-1
Assembling the platform floor (first platform section)
1
5/16 x 3/4 in. truss head bolt (S-
10267)
6
Outside support angle (WBS-0015)
3
5/16 in. flange nut (S-3611)
7
Platform floor pan (WBS-0011)
5
Intermediate support angle (WBS-
0017)
A
Arrangement of intermediate support angles
(Viewed from front)
46
PNEG-2077
TopDry – Platforms and Bin Stairs