![GSi PNEG-1894 Installation Manual Download Page 22](http://html1.mh-extra.com/html/gsi/pneg-1894/pneg-1894_installation-manual_2274989022.webp)
4. Installation
22
PNEG-1894
TopDry Chute Controller
Leveling the Dump Chutes
NOTE:
When testing the chute positions, tamper switch must be depressed when the cover is removed
before the system can function. Use tape to secure tamper switch in the depressed position.
1. The chain (C) is connected to a cable with a turnbuckle (D). The cable travels up the outside of the bin
to the chute pulley on the bin eave and goes through the sidewall sheet into the bin to the center collar
and down to the chain plate.
The plate is connected to the chutes via
chains. The controller retracts the cable to close the chutes or extends the cable to open the chutes.
2. Dump chutes should be level in the closed position. Use the turnbuckle to adjust the chutes until they
are level.
3. After adjustments are complete, verify the chutes fully open and close. Also, visually verify that the
sprocket goes through a full open to close rotation by performing the limit switch test described
in
.
4. When all adjustments have been made, secure the front chain guard cover to the chute position
controller mount.
5. Install the enclosure cover (A) and secure with eight (8) flange bolts (B).
Figure 4K
Ref #
Part #
Description
A
TD-101330
Enclosure Cover
B
S-6606
Flange Bolt 5/16"-18 x 3/4" ZN Grade 5
Summary of Contents for PNEG-1894
Page 1: ...PNEG 1894 TopDry Chute Controller Installation Manual PNEG 1894 Version 5 1 Date 09 27 20...
Page 12: ...12 PNEG 1894 TopDry Chute Controller 3 Controller Layout Figure 3A Chute Pulley Cable Location...
Page 14: ...4 Installation 14 PNEG 1894 TopDry Chute Controller Figure 4C...
Page 23: ...PNEG 1894 TopDry Chute Controller 23 5 Wiring and Schematic Diagrams Actuator Wiring Schematic...