![GSi PNEG-1894 Installation Manual Download Page 16](http://html1.mh-extra.com/html/gsi/pneg-1894/pneg-1894_installation-manual_2274989016.webp)
4. Installation
16
PNEG-1894
TopDry Chute Controller
4. Attach the lower mounting gussets (D) to stiffener mounting plate (A) using three (3) flange bolts (E)
and nuts (F) for each mounting gusset.
Figure 4E
Ref #
Part #
Description
A
TD-101327
Stiffener Mounting Plate
D
TD-101326
Lower Mounting Gussets
E
S-6606
Flange Bolt 5/16"-18 x 3/4" ZN Grade 5
F
S-3611
Flange Nut 5/16"-18 YDP Grade 2
Summary of Contents for PNEG-1894
Page 1: ...PNEG 1894 TopDry Chute Controller Installation Manual PNEG 1894 Version 5 1 Date 09 27 20...
Page 12: ...12 PNEG 1894 TopDry Chute Controller 3 Controller Layout Figure 3A Chute Pulley Cable Location...
Page 14: ...4 Installation 14 PNEG 1894 TopDry Chute Controller Figure 4C...
Page 23: ...PNEG 1894 TopDry Chute Controller 23 5 Wiring and Schematic Diagrams Actuator Wiring Schematic...