![GSi PNEG-1894 Installation Manual Download Page 13](http://html1.mh-extra.com/html/gsi/pneg-1894/pneg-1894_installation-manual_2274989013.webp)
PNEG-1894
TopDry Chute Controller
13
4. Installation
Chute Controller Installation for TopDry System
The chute controller is mounted to the side of a TopDry bin and actuates the chutes that allow the grain
to transfer from the drying floor to the bin floor.
NOTE:
Before beginning the chute controller installation, make sure the pulley bracket is properly
installed. The pulley bracket must be position above the chute controller location before installing
the stiffener mounting plate.
Locating the Chute Pulley Assembly
1. Position the pulley in the hole that is located 9-3/8" (23.8 cm) horizontally from the center of the
stiffener.
NOTE:
When positioning the pulley, ensure the pulley cable does not interfere with the
dump chutes. This can only be accomplish at every other stiffener.
Figure 4A
Field drill five (5) 3/8" diameter holes as shown in
. Attach the pulley assembly with
5/16" x 3/4" bolts with the neoprene on the inside of the bin.
Figure 4B
Summary of Contents for PNEG-1894
Page 1: ...PNEG 1894 TopDry Chute Controller Installation Manual PNEG 1894 Version 5 1 Date 09 27 20...
Page 12: ...12 PNEG 1894 TopDry Chute Controller 3 Controller Layout Figure 3A Chute Pulley Cable Location...
Page 14: ...4 Installation 14 PNEG 1894 TopDry Chute Controller Figure 4C...
Page 23: ...PNEG 1894 TopDry Chute Controller 23 5 Wiring and Schematic Diagrams Actuator Wiring Schematic...