![GSi 24' Gamma Installation Manual Download Page 23](http://html1.mh-extra.com/html/gsi/24-gamma/24-gamma_installation-manual_2274963023.webp)
4. Roof Assembly
PNEG-2262
24' Diameter Gamma Roof Assembly Instructions
23
Attaching the Rafter Assembly to the Peak Ring Weldment
The rafter assembly must be installed to support the peak ring weldment and main roof structure.
Before You Begin
The center collar and peak ring weldment should be assembled and secured to the support pole and the
rafter assembly should be assembled. Determine the correct location of each rafter assembly. For more
information, see peak ring placement on
What You Should Know
Make sure the other end of the rafter assembly is connected to the roof rafter bracket.
1. Attach the rafter assembly (4) to the peak ring weldment (1) and align with the proper holes as shown
in
2. Install the 3/8" x 1" flange bolts (2) and 3/8" flange nuts (3) to securing the rafter assembly (4) to the
peak ring weldment (1).
Figure 4K Installing the Rafter Assembly to the Peak Ring Weldment
After You Finish
Repeat same procedure for the rest of the rafter assemblies.
Ref #
Part #
Description
1
CRP-7304-BS
Peak Ring Weldment
2
S-7487
3/8" x 1" Flange Bolt with Sealing Washer
3
S-9426
3/8" Flange Nut
4
CRP-7341
Rafter Assembly