![GSi 24' Gamma Installation Manual Download Page 20](http://html1.mh-extra.com/html/gsi/24-gamma/24-gamma_installation-manual_2274963020.webp)
4. Roof Assembly
20
PNEG-2262
24' Diameter Gamma Roof Assembly Instructions
Attaching the Center Collar to the Peak Ring Weldment
The center collar assembly is a three piece design and attaches to the peak ring weldment using the
Z-collar support clips (4).
1. Position the Z-collar center collar support clips (4) on to the peak ring weldment as shown in
2. Install the 5/16" x 1" flange bolts (2) and 5/16" flange nuts (3), securing the Z-collar support clips (4)
to the peak ring weldment (1).
Figure 4G Assembling the Z-Collar Support Clips
3. Place the three center collar (5) pieces over the Z-collar support clips (4) and secure the center collar
pieces (5) together using 5/16" x 1" flange bolts (2) and 5/16" flange nuts (3) as shown in
NOTE:
Make sure the center collar (5) is free to move for adjustment on the Z-collar support clips (4)
to align with the roof flashing holes.
Figure 4H Attaching the Center Collar to
the Peak Ring Weldment
Ref #
Part #
Description
1
CRP-7304-BS
Peak Ring Weldment
2
S-10260
5/16" x 1" Flange Bolt with Sealing Washer
3
S-3611
5/16" Flange Nut
4
CRP-4900
Z-Collar Support Clip
Ref #
Part #
Description
1
CRP-7304-BS
Peak Ring Weldment
2
S-10260
5/16" x 1" Flange Bolt with
Sealing Washer
3
S-3611
5/16" Flange Nut
4
CRP-4900
Z-Collar Support Clip
5
CRP-4608
Center Collar