![GSi 214Q Installation Manual Download Page 37](http://html1.mh-extra.com/html/gsi/214q/214q_installation-manual_2274997037.webp)
6
Installing the Wet Bin
Topics Covered in this Chapter
Securing the Dryer Wet Bin Sides
Installing the Belt Guard and Load Motor
Installing the Drive Sheaves and Belts
Installing the Belt Guard Cover
Installing the Grain Intake Hopper
Raising the Load Auger
You must raise the load auger before you can install the dryer wet bin.
1. To raise the load auger:
• For dryers 8 ft. (2.44 m) use the handrails (1).
Figure 6-1
Handrail location for dryers 8 ft. (2.44 m) in length
1
Handrails for 8 ft. (2.44 m) dryer
PNEG-2132
Pressure Cooled Quiet Portable Dryer
37