
Chapter 6: Installing the Wet Bin
Installing the Drive Sheaves and Belts
To ensure that the load auger rotates, you must install the drive sheaves and belts. The motor turns the
drive sheaves and belts and the drive sheaves and belts turn the load auger.
1. Insert the key into the keyway on the auger drive shaft.
2. Place 16 in. sheave (D52-0001) on the auger drive shaft.
3. Insert the 1-1/2 in. split tapered Q1 bushing on the auger drive shaft and infix the bushing with a
wooden or non-metal mallet.
4. Install three bolts into the bushing. If necessary, smooth the load auger drive shaft with hardware
cloth.
5. Insert the key into keyway and slide the motor drive sheave onto the drive shaft of the load motor.
6. Secure the drive sheave with the setscrew.
7. Thread the two BX97 belts from the motor drive pulley to the 16 in. sheave.
8. Check the alignment of the belts and sheaves to ensure that they are aligned.
9. To tighten belts, turn the turnbuckle on the anchor bracket of the motor mount.
10.Adjust the clearance of the belt guard body so that there is no contact with moving parts and tighten
the adjustment hardware.
Figure 6-7
Load motor sheave and motor adjustment turnbuckle
7
Load motor sheave
8
Motor adjustment turnbuckle
PNEG-2132
Pressure Cooled Quiet Portable Dryer
41