![GSi 214Q Installation Manual Download Page 47](http://html1.mh-extra.com/html/gsi/214q/214q_installation-manual_2274997047.webp)
6. Install the pipe conduit (11) between the blower (5) and the unload (12) using a hose clamps (13) to
fasten together each section. Guide the conduit through the conduit hangers (7).
Figure 7-4
Hose installation
5
Blower assembly (D04-1016)
12
Unload
7
Conduit hangers (S-6643)
13
Hose clamp (AP-0583)
11
Pipe conduit (D04-1023)
PNEG-2132
Pressure Cooled Quiet Portable Dryer
47