28
PNEG-1020 Bin Sweep Auger
Startup
6. STARTUP
6.1 Perform Pre-start Checks
Failure to perform any or all of these pre-start checks may cause damage to the equipment and/or
cause SERIOUS INJURY or DEATH to those in the work area.
Failure to perform any or all of these pre-start checks may also be a misuse of the equipment. Any
misuse of the equipment may void the warranty.
1. Make sure ALL belts are tensioned properly.
2. Make sure ALL shields are in place and that the belt(s) and pulley(s) are able to move
freely.
ALWAYS keep ALL guards and shields in place, until all the power is disconnected and locked out.
3. Inspect the drive unit for any problems or potential problems.
4. Be aware of any emergency shutdown procedures. Two (2) people must always be in a
position where the operation of the equipment can be monitored.
5. Before starting the auger for the first time, make sure that all parts are assembled correctly
according to the instructions in this manual.
Make certain ONLY trained operators are in the work area before operating or moving the machine.
Two (2) people must always be in a position where the operation of the equipment can be
monitored.
6.2 Start the Auger
1. Start the auger.
DO NOT start or stop the auger while it is under load. Doing so may cause the auger to “jam”.
2. Run the auger through a “break-in” period, if it is being used for the first time or for the first
time.
3. Polish the flighting by running the auger at partial capacity until it is smooth, before
attempting full capacity.
WARNING
WARNING
WARNING
WARNING