![GSI Group PNEG-1020 Installation & Operation Manual Download Page 27](http://html1.mh-extra.com/html/gsi-group/pneg-1020/pneg-1020_installation-and-operation-manual_2275180027.webp)
PNEG-1020 Bin Sweep Auger
27
10" Bin Sweep Assembly & Installation
5.13 Install the Bin Sweep into
the Bin
1. Place the bin sweep auger in the bin after
all the grain that can be removed through
the center well and intermediate well
have been removed.
2. Place the pin, located on the sweep
motor mount, into the tube provided on
top of the well.
3. Lay the sweep auger on the pile of
sloping grain.
4. Use the extension tube between the
motor mount and the bin well, if desired.
5. Attach the suitable electric wiring to the
motor in a manner that will permit the
sweep to rotate around the bin.
Note: The motor starting controls must be
located outside the bin. The must
NEVER be installed on the sweep
inside the bin.