![Grundfos Selcoperm SES 125-2000 Installation And Operating Instructions Manual Download Page 13](http://html1.mh-extra.com/html/grundfos/selcoperm-ses-125-2000/selcoperm-ses-125-2000_installation-and-operating-instructions-manual_2271488013.webp)
English (GB)
13
4. Installation
4.1 Installation drawings
4.1.1 Installation overview
Fig. 7
Selcoperm installation
TM
04
15
02
30
17
A
A
A : A
500 - 750
500 - 750
1
5
6
7
8
3
2
3
4
Warning
Horizontal ventilation pipework has
to be installed with a constant
upwards incline towards a safe
discharge point!
min.
200
0
min. 700
min. 150
1
Duty/standby dosing pumps
5
Pressure level sensor
2
Product tank and collecting tray
6
Tray flood switch of product tank
3
Selcoperm electrochlorinator
7
Safe ventilation area
4
Brine tank
8
Drill hole 3" for ventilation pipework