23
GROWSPAN
™
ROLLING PREMIUM HIGH TUNNELS
Revision date: 01.01.16
INSTALL THE CORNER STRUTS
The main frame includes two (2) 111405 struts to be installed at each corner. See the diagrams below and in the Quick
Start section for details.
Gather the parts:
• 111405 Struts
• QH1404 Band Clamps and FA4482B Tek Screws
• Lifts, ladders, tools, and assistants
as needed.
Attach the 111405 Frame Struts — See View 8 on page 48 for additional details.
1. Slide two QH1404 band clamps over the second rafter above the lower purlin. Use pliers as needed to spread the
clamps and a small hammer to lightly tap the clamps over the rafter. Squeeze the clamps back into shape using pliers.
2. Use the same technique to place a QH1404 band clamp over the end rafter and the third rafter as shown.
3. Connect two 111405 struts to the frame using the installed band clamps.
4. Tighten the clamps and secure each band clamp to the rafter using one FA4482B Tek screw for each clamp.
5. Continue with the next procedure.
Step 1
Step 2
Step 2
Step 1