-20-
Model G0751 (Mfg. Since 1/13)
Spindle break-In
Before placing operational loads on the spindle,
complete this break-in procedure to fully distribute
lubrication throughout the bearings and ensure
trouble-free performance.
2. run machine for a minimum of 10 minutes.
3. repeat Step 2 for each spindle speed, work-
ing to progressively higher speeds.
Note: If the machine is new, we recommend
changing the headstock oil while it is still warm
and any particles from the manufacturing process
are still in suspension (refer to
Page 32 in the
Lubrication subsection for detailed instructions).
the spindle break-in is now complete!
Do not leave this machine unattended during
the Spindle break-In procedure. If your
attention is needed elsewhere during this
procedure, stop the machine and restart the
procedure later from the beginning.
Inspections &
Adjustments
the following list of adjustments were performed
at the factory before the machine was shipped:
•
gib adjustments .............................
Page 40
•
Leadscrew Backlash
adjustments ....................................
Page 40
•
return spring tension ....................
Page 43
Be aware that machine components can shift
during the shipping process. pay careful atten-
tion to these adjustments during operation of the
machine. if you find that the adjustments are not
set according to the procedures in this manual or
your personal preferences, re-adjust them.
To perform the spindle break-in procedure:
1. Make sure the spindle is completely stopped,
then set spindle speed to 90 rpM (refer
to
Setting Spindle Speed on Page 28 for
detailed instructions).
Failure to complete the spindle break-in
process may lead to premature failure of the
bearings—this will not be covered under
warranty.
Summary of Contents for G0751
Page 64: ......