installation and operation manual
GreenLife
hybrid manager
Technical support via:
Stand: 03.05.19
phone: +49 (0) 385 7733 775
Subject to technical changes
E-Mail:
7
We shall not be liable for printing errors
www.greenlife.de
drain
connection
male thread 1 ¼“
connections GHM 0.14
connections GHM 0.35 and 0.50
pump GUP 46 inflow
male thread 1 ¼“
from the tank
siphon emergency
overflow DN 110
optional connection
mains water
connection
male thread ¾“
booster station male thread 1 ¼“
(service water) on the bottom
pump GUP 46 inflow
male thread 1 ¼“
from the tank
drain
connection male thread 1 ¼“
optional connection
mains water
connection
male thread ¾“
booster station male thread 1 ¼“
(service water)
siphon emergency
overflow DN 110