![Greenlife hybrid manager Installation And Operation Manual Download Page 22](http://html1.mh-extra.com/html/greenlife/hybrid-manager/hybrid-manager_installation-and-operation-manual_2262929022.webp)
installation and operation manual
GreenLife
hybrid manager
Technical support via:
Stand: 03.05.19
phone: +49 (0) 385 7733 775
Subject to technical changes
E-Mail:
9
We shall not be liable for printing errors
www.greenlife.de
connection pressure line
•
use at least a 1“ pressure line
•
please check the performace chart of the pump for the maximum distance
•
the pressure line has to be installed in one piece from the feeder pump into the hybrid
tank
•
connect the floating suction on the feeder pump GUP 46 (pre-installed 1“ brass
nozzle)
•
the pressure line has to be routed steadily from the underground tank tot he hybrid
tank
GHM 0.14 to 0.50
double plug
booster station
(not scope of delivery)
feeder pump GUP 46
mains water back-up
pressure line 1“
and electric cable