EN / 7
UNPACKING THE CABINET
CAUTION
• Unpacking the cabinet in a low-temperature environment may cause condensation to occur in and
on the cabinet. Do not install the cabinet until the inside and outside of the cabinet are absolutely dry
(hazard of electric shock).
• The cabinet is heavy. Be careful to unpack and move the cabinet.
Carefully to move and open the carton. Keep the components packaged until ready to install.
To unpack the cabinet and accessories:
1. Open the outer carton and remove the accessories packaged with the cabinet.
2. Carefully lift the cabinet out of the outer carton.
3. Discard or recycle the packaging in a responsible manner, or store it for future use.
Place the cabinet in a protected area that has adequate airfl ow and is free of humidity, fl ammable gas, and
corrosion.
CHECKING THE ACCESSORIES
It includes:
• UPS user’s guide
• Software Suite CD
• USB cable
• Power cord (Input and output)
• RS232 cable
If you ordered an optional Extended Battery Module (EBP), verify that the following additional item is included with
the EBP:
• EBP user’s guide
NOTE
Discard the EBP user’s guide if you are installing the EBP with a new UPS at the same time. Use the UPS user’s
guide to install both the UPS and the EBP.
RACKMOUNT INSTALLATION
The Rackmount cabinet comes with all of the hardware required for installation in a standard EIA or JIS seismic
Rackmount confi guration with square and round mounting holes. The rail assemblies adjust to mount in 19” racks
with a distance from front to rear around 70~76 cm (27 to 30 inches) deep.
CHECKING THE RAIL KIT ACCESSORIES (OPTIONS)
Verify that the following rail kit items are included for each cabinet:
• Left rail assembly:
- Left rail
- Rear rail
- (3) M5_8 pan-head screws
• Right rail assembly:
- Right rail
- Rear rail
- (3) M5_8 pan-head screws
• Rail hardware kit:
- (8) M5 butterfl y nuts
- (2) rear stop brackets
- (8) M5 umbrella nuts
• Mounting bracket kit:
- (2) mounting brackets
- (8) M4_8 fl at-head screws
TOOLS REQUIRED
To assemble the components, the following tools may be needed:
• cross-shaped screwdriver
• and 6 mm wrench or socket
Summary of Contents for 1.5KVAH-RT
Page 77: ...PL 77...