GREE U-Match 5 SERIES UNIT SERVICE MANUAL
125
Removal of condenser
Note: Before removing the condenser, make sure there is no refrigerant in the pipeline and power is cut off.
Step
Picture
Work instruction
3. Remove motor support.
When removing the motor
support, be careful to protect the
components.
4. Remove the condenser.
Heat up the welding points of
connection pipes through gas
welding until the pipes break off.
Note: When welding the pipes,
do not let the flame burn the
other components. The welding
points of condenser are steel and
copper welding points. Be sure to
maintain the welding quality.
5. Take out the condenser.
Loosen the securing screws of
condenser support. Take off the
plate type heat exchanger and
the support as a whole.
6. Install the new condenser.
Secure the screws of condenser
and support. Then fix them
together on the chassis.
Install the condenser by referring
to the positions of entering and
leaving pipes. Weld the
connection pipes.
Nitrogen welding: the pressure of
nitrogen is 0.5±0.1kgf/ c
㎡
(relative pressure).
Note: When welding the pipes,
do not let the flame burn the
other components.
Summary of Contents for U-Match 5 Series
Page 31: ...GREE U Match 5 SERIES UNIT SERVICE MANUAL 28 Model GUD100W NhA T...
Page 32: ...GREE U Match 5 SERIES UNIT SERVICE MANUAL 29 Model GUD125W NhA T GUD140W NhA T...
Page 33: ...GREE U Match 5 SERIES UNIT SERVICE MANUAL 30 Model GUD100W NhA X...
Page 34: ...GREE U Match 5 SERIES UNIT SERVICE MANUAL 31 Model GUD125W NhA X GUD140W NhA X...
Page 35: ...GREE U Match 5 SERIES UNIT SERVICE MANUAL 32 Model GUD160W NhA X...
Page 59: ...GREE U Match 5 SERIES UNIT SERVICE MANUAL 56 Troubleshooting...
Page 78: ...GREE U Match 5 SERIES UNIT SERVICE MANUAL 75 Troubleshooting...
Page 224: ...JF00303775...