AHU-KIT
25
a corresponding slot(see circuit diagram).
(2)
Using bundles to fix the magnetic ring is required. It’s also need to insert the bundle into
the reserved hole on the control box.
(3) Fixing the cable with the wire clamp, and tightening the Cable-Cross Loop.
(4) Fix the magnetic ring to the reserved hook fixing inside electrical box with
high-temperature bonding tie.
(5) Screw the joint
4.2.3.2.Installation requirements
(1) Ensure that the cable in the control box is in a relaxed state, and both the joint of terminal
and the fixed place of magnetic ring are all not under a stress.
(2) Ensure that the cable sheath port is located in the control box in order to prevent the rain.
Fig.4.2.2 Fig.4.2.3
4.3 Installation of the EXV Cable
Referring to the circuit diagram, then connect the EXV cable to the circuit-board of control box.
Be sure that the cable is fixed firmly in order to ensure a good pull relieve and water protection.
4.4 Piping Installation
When one AHU-KIT is connected to one AHU, the piping installation diagram is as follows: