Page
44/55
11-4. MOTOR START
- PROCESS SELECT
Select process to be operated.
BREAK-IN,
PROGRAM,
TEST
- Operation limitation
Motor operation could be only possible, if only one channel is used.
Second output can not be used at the same time.
11-5.
DELAY
TIME
- This mode is to delay time before CHARGE, DISCHARGE, STEP-CHG
This mode is only available for above modes.
- “EXPECT TIME 000min” is expected operating time.
Expected charge time is calculated based on 60W for each output if the
overall input power is 120W.
Expected time can vary in accordance with selected input power in CONFIG
SETUP.
- In order to activate delay operation, “DELAY TIMER 000min should be changed.
- This mode is based on the present time to reserve time to be finished.
When expect time is set, “EXP.FINSH am00:00:00 ( Expected finished
time ) should be shown on the screen.
EXP. FINISH = DELAY TIME + EXPECT TIME + ACTUAL TIME (RTC)
- If expected time is over 900minutes, the reserve operation screen is not shown.
- Expect time can vary in accordance with selected power or AC Power (internal) in
CONFIG SETUP.
- The expected charge time of NiMH/NiCd batteries will be 120% of the battery
capacity, except the maximum adjusted charge capacity is lower as 120%.
Summary of Contents for 6478
Page 13: ...Page 13 55 ...