Installation
332590A
7
Install Cellular Module
18. Use two locking nuts (5) to secure cellular
module (1) to bracket (3). Orient module (1) on
bracket so LED window (AA) is easily visible to
operator when bracket is installed on Reactor.
19. Loosen left side acorn nuts (AN) holding Reactor
display to frame until display can be lifted enough to
slide bracket between frame and display. See F
IG
. 7.
NOTE: It is not necessary to completely remove the
acorn nuts on the electric Reactor.
20. Slide bracket between display and frame so that
bracket mounts to the behind the display with the
LED status window (AA) visible to operator and the
cable connector on the bottom. See F
IG
. 7.
21. Tighten acorn nuts (AN) to secure bracket in place.
See F
IG
. 7.
22. Connect 4-pin end of cable (4) to cellular module (1)
connector. See F
IG
. 7.
23. Route cellular module cable (4) to control box (D).
Secure with wire ties (8) as needed.
24. Connect other end of cellular module cable (4) to
control box (D) connector.
NOTICE
To prevent cracking the plastic shell of the cellular
module (1), do not overtighten nuts (5) when install-
ing onto bracket (3).
5
1
3
AA
ti21689a
F
IG
. 7
ti21690a
D
D
Electric Reactor
Hydraulic Reactor
AN
1
3
5
AN
5
1
3
4
4