background image

Installation 

6

332590A

12. On the left wall inside the Reactor cabinet, locate 

and identify whether your system uses the tempera-
ture control module or temperature control board. 
See F

IG

. 4 and F

IG

. 5 for an example of each.

13. For models with temperature control board, connect 

TEMP cable (T) to J8 on board. See F

IG

. 4.

14. For models with temperature control module, 

remove cover kit (AA) then connect TEMP cable to 
J8 on module. Re-install cover kit (AA). See F

IG

. 5.

NOTE: The cap on the HEAT cable plug may prevent 
plug from being fully inserted into the temperature con-
trol module. Press plug to the right then press plug the 
rest of the way into place.  

15. Connect PUMP cable (P) to J12 on motor control 

board. 

16. Secure power cables away from hose transformer 

hot surfaces. 

17. Re-install Reactor cabinet front access door.

F

IG

. 4: Temperature Control Board

F

IG

. 5: Temperature Control Module

J8

ti21803a

T

J8

AA

ti21804a

F

IG

. 6: Motor Control Board

J12

J12

Models E-30 and E-XP2

Models E-20 and E-XP1

Hydraulic Reactor Models

J12

ti21813a

ti21805a

ti21806a

P

P

P

Summary of Contents for InSite 24T278

Page 1: ...temperature setpoint actual pressure pressure setpoint cycles and GPS location from a Reactor proportioner Not approved for use in explosive atmospheres or hazardous locations Model 24T278 Important S...

Page 2: ...Reac tor models Manual Description 312062 Hydraulic Reactor Operation 312063 Hydraulic Reactor Repair 312065 Electric Reactor Operation 312066 Electric Reactor Repair Reactor Model Part Numbers E 20...

Page 3: ...cables from control box 2 through split rubber sheet in top of cabinet NOTE Electric Reactor only When installing the control box in the following step pull wires through the split rub ber sheet in to...

Page 4: ...grounding wire G from control box into grounding terminal block 6 supplied with kit then tighten screw Y to secure wire 9 Install grounding terminal block 6 onto right end of DIN rail then tighten cen...

Page 5: ...Installation 332590A 5 FIG 1 Electric Reactor DIN Rail Style 1 FIG 2 Electric Reactor DIN Rail Style 2 FIG 3 Hydraulic Reactor DIN Rail Style 3 B C S F Z 6 G Y X B C S F X G Y 6 F S B C 6 Y X...

Page 6: ...install cover kit AA See FIG 5 NOTE The cap on the HEAT cable plug may prevent plug from being fully inserted into the temperature con trol module Press plug to the right then press plug the rest of...

Page 7: ...ween display and frame so that bracket mounts to the behind the display with the LED status window AA visible to operator and the cable connector on the bottom See FIG 7 21 Tighten acorn nuts AN to se...

Page 8: ...en LED on the Temperature Control Module will blink rapidly and the display will show E99 When the update is com plete the green light on the Temperature Control Mod ule will blink slowly and the disp...

Page 9: ...l number from the cel lular box below Verify Module Status To check the status of the cellular module locate the status LEDs on the module then refer to the following chart LED Status Description Gree...

Page 10: ...lled See Installation on page 3 Verify 12V at output of the power supply Make sure the M8 4 pin to M12 8 pin cable is installed between cel lular module and control box Has not identified GPS location...

Page 11: ...mocouple is not correctly installed on the hose or is broken See Reactor repair manual Pressure data not displayed on website 4 pin connector is not plugged into the correct terminal on the tempera tu...

Page 12: ...2e SPACER nylon 1 2f NUT 4 40 1 2g LABEL 1 2h 127189 CONVERTER 1 2i 127188 POWER SUPPLY 12V 1 3 16V506 BRACKET mounting 1 4 24T050 CABLE M8 4 pin Female to M12 8 pin Male 1 5 meters 1 5 NUT locking 8...

Page 13: ...Weight 2 3 lb 1 0 kg Cellular Module Weight 0 5 lb 0 2 kg Voltage into Control Box 100 240VAC 50 60 Hz Operating Temperature 22 to 167 F 30 to 75 C Storage Temperature 40 to 185 F 40 to 85 C Ambient...

Page 14: ...ipment does not disclose any defect in material or workmanship repairs will be made at a reasonable charge which charges may include the costs of parts labor and transportation THIS WARRANTY IS EXCLUS...

Reviews: