![Graco CGM 25B127 Instructions - Parts Manual Download Page 4](http://html1.mh-extra.com/html/graco/cgm-25b127/cgm-25b127_instructions-parts-manual_2251101004.webp)
Installation
4
3A6338B
5. Connect the CAN cable from either CAN connection
on the CGM to port 2 on the EFR.
6. If used, connect the Ethernet, DeviceNet, or
PROFIBUS cable (J) to the CGM as applicable.
Connect the other end of the cable to the FieldBus
device.
7. Reinstall the pump yoke shroud (F) and the frame
cover (G) onto the EFR system.
8. Perform the Install or Update Data Map procedure
in the Communications Gateway Module,
Instructions – Parts manual.
9. See
Available Internal Data
on page 8 for details
regarding the FieldBus pinout setup.
10. Perform the
Setup
procedure on page 5 to
configure the fieldbus.
NOTE:
To produce an accurate dispense, the dispense
valve must be controlled directly by the EFR. See the
Electric Fixed Ratio Proportioner, Setup - Operation
manual for I/O integration of the dispense valve with the
EFR.
NOTE:
See
Automation Outputs (signals from PLC
to EFR System)
on page 22 for information on
triggering a dispense through the EFR using the CGM.
NOTICE
Ensure the CAN cable is connected to the appropriate
CAN connection. Failure to connect the CAN cable to
the correct CAN connection can result in damage to
the CGM module.
F
IG
. 5: Cable Connections
F
IG
. 6: Cable Connections
CAN
Connector 1
ti11972a
CAN
Connector 2
ti11985a