GMC-I Messtechnik GmbH
13
6.3.2
Simulated Wire Reversal
➭
Turn the left-hand rotary selector
switch to the
L1-N
position in the green
area for 3-phase wire reversal.
➭
Switch through the positions, one after
the other, in the clockwise direction (ta-
ble from top to bottom).
It must not be possible to activate the PRCD
when any of these faults is simulated.
6.3.3
Simulation of PE to Phase
➭
Set the left-hand rotary selector switch
to the
PE-U
EXT
position.
It must not be possible to activate the PRCD
when this fault is simulated.
➭
Step 18: see section entitled “Protective
Conductor Current Measurement” on
page 9.
St
e
p
Rotary
Switch
Test Adapter
PRCD Action
L1
LED
L2
LED
L3
LED
N
LED
PE
LED
LED
11
It must not be possible to
activate the PRCD.
12
It must not be possible to
activate the PRCD.
13
It must not be possible to
activate the PRCD.
14
It must not be possible to
activate the PRCD.
15
It must not be possible to
activate the PRCD.
16
It must not be possible to
activate the PRCD.
St
e
p
Rotary
Switch
Test Adapter
PRCD Action
L1
LED
L2
LED
L3
LED
N
LED
PE
LED
LED
17
It must not be possible to
activate the PRCD.
PROFI
TEST
⏐
P
RCD
Fault Simulation