
10
GMC-I Messtechnik GmbH
6
Fault Simulation
Note!
If you operate your test adapter at an
electrical system with a 30 mA
breaker, the mains RCCB may be
tripped during the tripping test (trip-
ping current and time to trip) instead
of the PRCD. In this case the
MAINS
L1
LED goes out.
6.1
PRCD-S (single-phase)
➭
Switch mains power on by
turning the right-hand rotary
selector switch to the
1~ ON
position.
6.1.1
Simulated Interruption
➭
Start with the left-hand rotary se-
lector switch in the first
ON
position in the
orange area for single-phase interrup-
tion.
➭
Switch through the positions, one after
the other, in the clockwise direction (ta-
ble from top to bottom).
6.1.2
Simulated Wire Reversal
➭
Turn the left-hand rotary selector
switch to the
L1-PE
position in the orange
area for single-phase wire reversal.
Instead of the
L1 LED
, the
PE LED
must light up.
It must not be possible to activate the PRCD
when this fault is simulated.
6.1.3
Simulation of PE to Phase – PE-U
EXT
➭
Set the left-hand rotary selector switch
to the
PE-U
EXT
position.
The
L1 LED
and the
PE LED PE
light up.
It must not be possible to activate the PRCD
when this fault is simulated.
St
e
p
Rotary
Switch
Test
Adapter
PRCD Action
L1
LED
PE
LED
LED
1
Activate the PRCD.
2
The PRCD is
tripped. It must not
be possible to
reactivate it.
3
Activate the PRCD.
4
The PRCD is
tripped. It must not
be possible to
reactivate it.
5
Activate the PRCD.
6
The PRCD is
tripped. It must not
be possible to
reactivate it.
St
e
p
Rotary
Switch
Test
Adapter
PRCD Action
L1
LED
PE
LED
LED
7
It must not be
possible to activate
the PRCD.
St
e
p
Rotary
Switch
Test
Adapter
PRCD Action
L1
LED
PE
LED
LED
8
It must not be possi-
ble to activate the
PRCD.
PROFI
TEST
⏐
P
RCD
Fault Simulation