Goslyn – Oil Recovery Program
Page
13
installing the goslyn™ to the ovens
…
1.
Run 1 ½” copper from the top ovens to the inlet of the goslyn (You will need a 2” to 1 ½”
reducer for the inlet.
2.
Be sure to brass unions on the stub out from the oven to the wall to allow employees to
move the ovens for cleaning. There needs to be a quick disconnect when you are
plumbing from the wall to the goslyn.
3.
Run 1 ½” copper from the lower ovens to the 1 ½” hole located on the lower section of
the lower oven pump tank. Use disconnects after you leave each oven and before
entering the lower oven pump tank.
4.
Use ¾” copper to come out of the top of the pump and connect it to the 1 ½” line
running from the top ovens (You will need a 1 ½” to ¾” reducing T). Be sure to put a ¾”
union on this line just above pump outlet in case the pump needs to be replaced at a
later date.
5.
Run a 1 1/2” line from the outlet of the goslyn™ to the floor drain.
6.
Run a 1 1/2” line from the overflow located on the top portion of the lower oven drain
pump.