STEP 3 - MOUNTING
3.1
Shim frame to level the underside of the outer frame to prevent racking/twisting (shims
included).
3.2
Verify frame is square by checking diagonals.
3.3
Torque frame attachment hardware to 260 lb ft, Turn-of-Nut method is acceptable
3.4
If beams are not factory prepped, end prep incoming beams. Additional parts required from
factory (see Appendix A on pages 11-14 for detail).
3.5
Use provided 3/4” A325 bolts, washers and nuts to loosely assemble monorail beam to
switch. Do not tighten yet.
3.6
Shim inlet and outlet beams 0” to 1/32” lower than switch track.
3.7
Set gap between inlets and switch track is 1/8” maximum. Ensure that beam ends do not
rub or bind as they pass each other.
3.8
Once beam is positioned, tighten beam attachment hardware. Torque to 260 lb ft. Turn-of
Nut method is acceptable.
5
11/2018
Diagram 3A.
Shim detail.
OUTLET
INLET
Summary of Contents for Tarca I Series
Page 2: ...11 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 4: ...11 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 15: ...11 11 2018 APPENDIX A BEAM END PREP DIAGRAMS...
Page 16: ...APPENDIX A BEAM END PREP DIAGRAMS CONTINUED 12 11 2018...
Page 17: ...13 11 2018 APPENDIX A BEAM END PREP DIAGRAMS CONTINUED...
Page 18: ...APPENDIX A BEAM END PREP DIAGRAMS CONTINUED 14 11 2018...
Page 19: ...15 11 2018 APPENDIX B WIRING DIAGRAMS 2 Way Motorized Schematic...
Page 20: ...APPENDIX B WIRING DIAGRAMS CONTINUED 16 11 2018 3 Way Motorized Schematic...
Page 21: ...17 11 2018 APPENDIX B WIRING DIAGRAMS CONTINUED 2 Way Pneumatic Schematic...
Page 22: ...APPENDIX B WIRING DIAGRAMS CONTINUED 18 11 2018 3 Way Pneumatic Schematic...