6
11/2018
STEP 4 - SAFPOWRBAR® WIRING (OPTION)
4.1
Prior to installing SAFPOWRBAR on monorail beams, flare/prep bar ends. Refer to
diagram 4A
for flaring procedure.
4.2
Gap between bar ends should be adjusted to 1/2”. It may be necessary to adjust the
position of the bars to ensure smooth traversing of the shoes. Refer to
diagram 4B
for
finished bar layout.
4.3
Actuate inner frame to verify bar clearance.
4.4
Switch jumper harness and current
taps are provided from factory.
Refer to Monorail Tarca® system
install manual, page 20, for
mounting current taps to
SAFPOWRBAR.
Diagram 4A.
SAFPOWRBAR® Flaring
Procedure.
Diagram 4B.
SAFPOWRBAR®
Summary of Contents for Tarca I Series
Page 2: ...11 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 4: ...11 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 15: ...11 11 2018 APPENDIX A BEAM END PREP DIAGRAMS...
Page 16: ...APPENDIX A BEAM END PREP DIAGRAMS CONTINUED 12 11 2018...
Page 17: ...13 11 2018 APPENDIX A BEAM END PREP DIAGRAMS CONTINUED...
Page 18: ...APPENDIX A BEAM END PREP DIAGRAMS CONTINUED 14 11 2018...
Page 19: ...15 11 2018 APPENDIX B WIRING DIAGRAMS 2 Way Motorized Schematic...
Page 20: ...APPENDIX B WIRING DIAGRAMS CONTINUED 16 11 2018 3 Way Motorized Schematic...
Page 21: ...17 11 2018 APPENDIX B WIRING DIAGRAMS CONTINUED 2 Way Pneumatic Schematic...
Page 22: ...APPENDIX B WIRING DIAGRAMS CONTINUED 18 11 2018 3 Way Pneumatic Schematic...