background image

7

Communicating Two Stage Air Conditioner or Heat Pump

Figure 8

Communicating Inverter Air Conditioner or Heat Pump

Figure 9

3. Download the 

CoolCloud

 HVAC phone application for   

    charging and to configure /test system.

NOTE: 

When new versions of Bluetooth Communication Software 

and Air Handler Control Software are available, the phone appli

-

cation notifies the user. Software updates are classified as either 

optional or mandatory and installed by using the phone applica

-

tion. Ensure all mandatory software updates have been installed. 

Review notes for optional software updates and install if necessary.

NOTE:

 If an E11 code exists for the inverter system immediately 

after line voltage is applied (code displayed on the outdoor inverter 

control), the System Verification Test needs to be completed before 

any other operation. See the following procedure.

1.   Provide Line Voltage to the Inverter and MBVC systems
2.   Allow the system to remain idle for 5 minutes
3.   Apply a G call (FAN CALL) to the MBVC control. Do not 

provide any other 24VAC thermostat call. Confirm the 

blower starts running. This step is critical. The MBVC blower 

must be running before continuing to step 4.

NOTE:

 The following steps must be completed on the outdoor 

inverter control board. Not on the MBVC control.

4.   Locate the 3 push buttons under the 3 seven segment 

displays.

5.   The 7 Segment display should be showing 



.

6.   Press and hold the RECALL button for 5 seconds. The 7 

Segment display should show 

.



. Release the RECAL 

button.

7.   Press and hold the RECALL button again for another 5 

seconds. the 7 Segment display should show 

.



. Release 

the RECALL button.

8.   Press and hold BOTH the RECALL AND TEST buttons for 5 

seconds. The 7 Segment display should show 

.



. Release 

the RECALL AND TEST buttons. Note, if you only hold the 

RECALL button during this step the display will show 

.



You will then need to press the LEARN button and then start 

over from step 5.

9.   Press and release the RECALL button (do not hold it down) 

3 times until the 7 Segment display shows 

.



.

10.  Press and Release the TEST button. The 7 Segment display 

wil show 

.



.

11.  Press and release the RECALL button. The 7 Segment display 

will show 

.



. Note: the display will be flashing at this time.

12.  Press and release the TEST button to stop the flashing.
13.  Press and release the TEST button again to exit this menu.
14.  Step 13 successfully enable the mandatory system test. 

Press the LEARN button to return to the main screen. The 

7 Segment display will show 



. The outdoor Inverter will 

start up momentarily. Once the system test has completed, 

any errors seen during the test will be displayed. If the test 

passed, 

 

will clear, the system will shut down by itself 

and you can proceed to charging.

Charging Instructions for an Inverter Outdoor Unit

1.   Apply a G call (FAN CALL) to the MBVC control. Do not 

provide any other 24VAC thermostat call. Confirm the 

blower starts running. This step is critical. The MBVC blower 

must be running before continuing on.

NOTE:

 The following steps must be completed on the outdoor 

inverter control board. Not on the MBVC contol.

2.   Locate the three push buttons under the three 7 Segment 

displays.

Summary of Contents for MBVC 1 Series

Page 1: ...MENT THE MANUFACTURER WILL NOT BE RESPONSIBLE FOR ANY INJURY OR PROPERTY DAMAGE ARISING FROM IMPROPER SERVICE OR SERVICE PROCEDURES IF YOU SERVICE THIS UNIT YOU ASSUME RESPONSIBILITY FOR ANY INJURY OR...

Page 2: ...edobjects etc If you come in contact with an ungrounded object repeat step 2 before touching control or wires 4 Discharge your body to ground before removing a new control from its container Follow st...

Page 3: ...ons Internal algorithms will provide 2 stage or inverter Air Conditioner or Heat Pump functionality based on these simple inputs With built in Bluetooth operation the CoolCloud HVAC phone appli cation...

Page 4: ...f the blower cabinet Figure 3 NOTE All panels should be in place when installing the unit NOTE Supply ductwork for counterflow applications must be Class I However if combustible ductwork is used shee...

Page 5: ...disconnected during shipping and handling 208 230 Volt Line Connections If heater kits will not be installed remove the proper size knockout for the electrical conduit connection Connect electrical c...

Page 6: ...et on a circuit different from that to which the receiver is connected Consult the dealer or an experienced radio TV technician for help Actual screens may look different based on the mobile device be...

Page 7: ...show Release the RECAL button 7 Press and hold the RECALL button again for another 5 seconds the 7 Segment display should show Release the RECALL button 8 Press and hold BOTH the RECALL AND TEST butt...

Page 8: ...he system has already terminated charge mode Pressing the LEARN button will exit the menus If after pressing the RECALL button at step 8 the 7 Segment displays still show press RECALL to change the di...

Page 9: ...e stage Heat Pumps for two stage Air Conditioners and for 2 stage Heat Pumps 4 Go to the Tonnage Units Menu and select the tonnage valuethatcorrespondstothedesiredairflowfortheoutdoor unit See the fol...

Page 10: ...or the thermostat energizes this terminal when dehumidifcation is required set the control board Dehum Logic Menu to using the push buttons or CoolCloud HVAC phone application If the humidistat opens...

Page 11: ...ermostatto ensureGsignal isenergized during accessory operation Figure 15 4 Select the appropriate fan only airflow for the accessory using the indoor unit push button menus or the CoolCloud HVAC phon...

Page 12: ...in a person s hand during grounding will be discharged 3 Service integrated control module or connecting wiring following the discharge process in step 2 Use caution not to recharge your body with sta...

Page 13: ...disconnected wiring connection at circulator motor power leads Open circuit in inductor or loose wiring connection at inductor 3 4 Hp and 1 Hp models only Failed circulator blower motor Tighten or co...

Page 14: ...necessary No Air Handler operation Circulator blower motor shuts down for over or under voltage condition Circulator blower motor shuts down due to over temperature condition on power module High or...

Page 15: ...Airflow Trim default 0 Cooling Airflow Profile setting default profile D shown as 4 Cooling Airflow On Delay Time default 5 seconds Cooling Airflow Off Delay Time default 60 seconds Percentage of hig...

Page 16: ...the next heat call if the heat pump fails to satisfy the custom target time for this number of consecutive cycles default 20 cycles Menu is enabled if the menu is set to 6 if the addition of low stag...

Page 17: ...nits Compressor Heat Low Stage Comm Units Compressor Heat High Stage Comm Units Electric Heat Single Stage Electric Heat Low Stage Electric Heat High Stage Defrost Single Stage Electric Heat non comm...

Page 18: ...r kit size See Menu Navigation and Selection Instructions above Default selection is 0 No Heat Kit Select installed heater kit for heater kit operation NR Not Rated Electric Heat Airflow Table Menu Na...

Page 19: ...ACED IT MUST BE REPLACED WITH WIRING MATERIAL HAVING A TEMPERATURE RATING OF AT LEAST 105 C USE COPPER CONDUCTORS ONLY 4 UNIT MUST BE PERMANENTLY GROUNDED AND CONFORM TO N E C AND LOCAL CODES 5 TO REC...

Page 20: ...and drain pan tab lets contain corrosive chemicals that can be harmful to aluminum tube and fin evaporator coils Even a one time application of these corrosive chemicals can cause premature aluminum...

Page 21: ...21 THIS PAGE INTENTIONALLY LEFT BLANK...

Page 22: ...22 THIS PAGE INTENTIONALLY LEFT BLANK...

Page 23: ...23 THIS PAGE INTENTIONALLY LEFT BLANK...

Page 24: ...p www amana hac com about us contact us You can also scan the QR code on the right for the product brand you purchased to be directed to the feedback page GOODMAN BRAND AMANA BRAND GOODMAN BRAND AMANA...

Reviews: