CE-SZENA
87
194
42
Module
W (
)
H (
)
D (
)
width
height
depth
P
.
reparing the cables entry
Break the flange to allow entry of cables through the upper and bottom parts of the
embedding box
.
Embedding box positioning
.
P
.
.
.
ass the wiring through the hole made in the embedding box Level and flush the embedding
box Once the embedding box is placed, remove the protective labels from the monitor
fastening holes
MONITOR INSTALLATION
38
Place the embedding box
.
.
5 cm.
The upper part of the door panel should be placed at 1.60m. height roughly The minimum
distance between the monitor embedding box and the closest object must be
37
Szena
:
.
monitor assembled on embedding box
Avoid placing the monitor near sources of heat, in dusty locations or smoky environments
Place the monitor at right angles to the connection block and align the attaching holes of
the monitor with the holes of the connection block, then lock out the monitor pressing its
lower side till the attachment clip locks the monitor firmly; as it is shown on the drawing
.
Fix the monitor.
MONITOR INSTALLATION
2,9 x 19
DIN-7981
2,9 x 19
DIN-7981
Fix the monitor by using the supplied screws. Finish the monitor assembly by pressing the
front cover.
Close the monitor.