![GMP G 14.25 Installation Manual Download Page 7](http://html1.mh-extra.com/html/gmp/g-14-25/g-14-25_installation-manual_2236380007.webp)
7
G
Line - INSTALLATION MANUAL
IRONER POSITIONING
CAUTION!
All operations must be carried out by fully qualified engineers.
DANGER!
Make sure that the floor static load limit complies with the equipment weight before positioning the ironer.
IMPORTANT!
To avoid damaging the appliance, do not let it drop when handling.
G
.25 and
G
.35
Open the doors using the key provided and remove the screws fixing the ironer to the pallet.
Slide 2 metal bars having a diameter of 25 mm and a length of 900 mm through the holes provided to the purpose, and hang
there 2 sets of belts suitable to lift the ironer weight.
On top of the belts, position a balancer.
Using a forklift, lift up the balancer carefully and place the ironer on the floor, ensuring it is perfectly stable.
G
.50
Open the doors using the key provided and remove the screws fixing the ironer to the pallet.
Slide the forklift forks between ironer and pallet, and lift it carefully from the pallet.
Place the appliance on the floor, ensuring it is perfectly stable.