Page 28 of 42
General Machine Products (KT), LLC
17. Tube integrity and Lubrication
This is entirely the responsibility of the operator.
To be sure that the tube into which the cable is to be inserted is installed appropriately, it is
recommended that its integrity and lubrication be checked.
Check that the tube is:
1. Not blocked
2. Not crushed
3. Continuous (no breaks)
4. Also check that any joins are pressure tight
5. Finally check that the tube is appropriately lubricated
The easiest and most straightforward way to complete these checks is to set the machine up
for a normal cable insertion but fit a seal in place of the cable. The tube can then be pressur-
ized without running the roller drive.
The checks listed at 1-4 (inclusive) above may all be carried out at the same time using one
check. The procedure is outlined below. Set up the air box and tube clamp as shown.
CAUTION:
Any object inadvertently left in the tube during the tube laying
may be expelled from the end of the tube with high force and velocity. It is im-
perative that no personnel be in the vicinity of the end of the tube or that a suita-
ble device is fitted to the end of the tube to arrest any expelled object.
When the air box has been set up as shown in
the photo, the air box and tube clamp should
be closed as for usual cable installation.
Fit the air box seal, tube and tube seal in
position as for normal cable installation.
Fit the appropriate plug as shown
(see appendix for plug number).
Continued on next page
Summary of Contents for Breeze 89010
Page 31: ...Page 31 of 42 General Machine Products KT LLC Page intentionally left blank ...
Page 39: ...Page 39 of 42 General Machine Products KT LLC ...
Page 40: ...Page 40 of 42 General Machine Products KT LLC Page intentionally left blank ...
Page 41: ...Page 41 of 42 General Machine Products KT LLC ...