● HAVE RECEIVED COMPREHENSIVE TRAINING IN THE USE OF THIS MACHINE.
● ARE COMPETENT AND AUTHORIZED TO USE IT AND HAVE READ AND UNDER-
STAND THIS MANUAL.
GENERAL MACHINE PRODUCTS (KT), LLC OR CBS PRODUCTS LTD. CANNOT BE
HELD RESPONSIBLE FOR MISUSE OF THIS EQUIPMENT.
Set up for installing cable with the machine mounted above ground:
1. Position the machine in line with the route of the duct.
2. Position the cable drum behind the machine and in line with the machine.
See sketch below (this shows a plan view of the recommended set up).
3. Ensure the machine is secure (either on its own stand or a separate suitable stand).
4. Ensure the machine is fitted with the appropriate guides and collets to suit the cable being
installed and the tubes into which the cable is to be installed. (See appendix 1 for details
of interchangeable parts).
To set the machine up to install cable it will be necessary to:
1. Fit the tube into which the cable is to be installed into the tube clamp and air box .
2. Fit the cable through the machine.
3. Connect the air supply to the machine.
4. Connect the electrical power input to the machine.
Cable Drum
Breeze Machine
Tube route
Summary of Contents for Breeze 89010
Page 31: ...Page 31 of 42 General Machine Products KT LLC Page intentionally left blank ...
Page 39: ...Page 39 of 42 General Machine Products KT LLC ...
Page 40: ...Page 40 of 42 General Machine Products KT LLC Page intentionally left blank ...
Page 41: ...Page 41 of 42 General Machine Products KT LLC ...