background image

Page 20

1.  We only do business upon the Conditions which appear below and no other.  Unless we so agree in writing 
these Conditions shall apply in full to any supply of goods by us to the exclusion of any Conditions or terms 
sought to be imposed by any purchaser.  These Conditions of Sale and Warranty Terms override those which 
are contained on the Invoice Forms and all Sales are now subject to these Conditions of Sale and Warranty 
terms only.
2.  PRICE
Once an order or call off has been accepted the price will be held for three months but if delivery is extended 
beyond  that  period  at  the  customer’s  request,  then  we  reserve  the  right  to  amend  the  price  when 
necessary
.  The company reviews its pricing annually to adjust for changes in our cost base.  We reserve the 
right to alter prices at any time for severe movements in raw materials (mainly copper and steel).  If there is to 
be a change we will give customers at least four weeks notice but anything delivered after that date will be at 
the revised price.  An order may not be cancelled or varied after acceptance without the written consent of the 
company.  Such cancellation or variation shall be subject to such reasonable charges as may be appropriate.
3.  SPECIFICATION
The goods are supplied in accordance with the Specifications (if any) submitted to the Purchaser and any addi-
tions and alterations shall be the subject of an extra charge.  Any goods not so specified shall be in accordance 
with our printed literature or the literature of any of our component suppliers (subject to any modifications 
made since publication).  If we adopt any changes in construction or design of the goods, or in the specification 
printed in our literature, the Purchaser shall accept the goods so changed in fulfilment of the order.
4.  PAYMENT
The invoice price of goods shall be payable within 30 days of despatch by us of our invoice for the goods or such 
longer time as may be stated by our quotation or invoice.  If we receive payment in full on or before the due date 
we will allow an appropriate settlement discount except where we have quoted a special net price.  If payment 
is not received in full on or before the due date we shall be entitled in addition to the invoice price to:
(i)  payment of a sum equal to any increase in the copper price supplement applicable to the particular goods 
sold between the date of receipt of order and the date of receipt of payment in full; and 
(ii)  interest on any part of the invoice price unpaid after the due date at the rate of 3% per annum over the 
base rate for the time being of HSBC Bank plc.
5.  TIME
We give estimates of delivery dates in good faith and time of delivery is not nor shall be made of the essence 
of any contract nor shall we be liable for any loss or damage occasioned by delay in delivery.
6.  DELIVERY
We deliver free normally by our own vehicles within 25 miles of any of our manufacturing depots.  Delivery to 
any place more than 25 miles from one of our manufacturing depots may be subject to our quoted delivery 
charges.  We reserve the right to make delivery of goods contained in one order by more than one consignment 
and at different times.  Where a period is agreed for delivery and such period is not extended by our Agree-
ment, the Purchaser shall take delivery within that period.    If the Purchaser fails to take delivery, we shall be 
entitled at the Purchaser's risk and expense to store the goods at the Purchaser's premises or elsewhere and to 
demand payment as if they had been despatched.  Off loading at point of delivery shall be the responsibility 
of and be undertaken by the Purchaser.
7.  SHORTAGES OR DAMAGE
Goods must be inspected before signature of delivery note and any damage, shortage or discrepancy noted 
on the delivery note and the goods returned on the same vehicle.  The buyer must also give us immediate 
written notice of the damage, shortage or discrepancy so that we may prompt investigation.
8. RETURN OF GOODS
Goods may not be returned to the Company except by prior written permission of an authorised officer of the 
Company and such return shall be subject to payment by the Purchaser of handling and re-stocking charges, 
transport and all other costs incurred by the Company.
9. COMPANY LIABILITY
All our goods are made of the best materials from reputable manufacturers and where stated are manufac-
tured to the appropriate British or European Standard.  Complaints must be given to us immediately, before 
any action is taken, as responsibility cannot be accepted if repairs or renewals are attempted on site without 
our written authority.  

Defects  caused  by  corrosion  or  scale  deposits  are  not  covered  by  this  guarantee  save  as  expressly 
provided in paragraph (f) of this Condition 9.

Where we agree to rectify any defect, we reserve the right to undertake the work on our own premises.  
The following guarantee covers faulty materials and manufacture for the stated period, provided that:-
•  The unit has been installed in accordance with our installation and service instructions and all relevant codes 

of practice and regulations in force at the time of installation.

•  That all necessary inlet controls and safety valves have been fitted correctly.
•  It has only been used for the storage of potable water supplied from the public mains.
•  Where appropriate the unit has been regularly maintained as detailed in the installation and service 

instructions.

(a) Domestic and Commercial Open Vented Cylinders and Tanks.
The copper storage vessel is guaranteed for ten years and if it proves to be defective either in materials or 
workmanship, we will either repair or supply replacement at our option with the closest substitute in the case 
of any obsolete product to any address in Great Britain.
(i)    free of all charge during the first year after delivery by us.
(ii)  thereafter at a charge of one-tenth of the then current list price and any copper price supplement and 
delivery charge during the second year after delivery by us and increasing by a further one-tenth on the second 
and subsequent anniversary of delivery by us.
(b)  Domestic Mains Fed Products [Primary Stores]
The copper storage vessel is guaranteed for five years and if it or any integral pipework as part of the storage 
vessel assembly proves to be defective either in materials or workmanship, we reserve the right to either repair 
or supply replacements or the closest possible substitute in the case of any obsolete product and will collect 
and deliver to any address in England, Wales and Scotland (excluding all Scottish Islands).
(i) free of all charge during the first year after delivery by us.
(ii) thereafter at a charge of one-fifth of the then current list price or any copper price supplement and deliv-
ery charge during the second year after delivery by us increasing by a further one-fifth on the second and 
subsequent anniversary of delivery by us.

Gledhill Building Products Ltd

(c)      Integrated Boiler and Storage Vessel Products and 
Stand Along Boilers
In  the  case  of  the  GulfStream  range  of  products  and  the    
Gledhill  boiler  range  of  products,    Gledhill  guarantees  the 
heat exchanger (boiler) for material and construction faults for 
two years and FURTHER we will meet the installer/contractors 
reasonable costs in removing and replacing any DEFECTIVE 
heat exchanger up to a MAXIMUM of one third of the extent 
of our liability in regard to the replacement product.
THE RESPONSIBILITY FOR THE EXECUTION OF THIS
GUARANTEE LIES WITH THE INSTALLER.
The guarantee becomes null and void if the appliance is used 
incorrectly,  or  in  the  event  of  proven  negligence  or  incor-
rectly  implemented  repairs  OR  FAILURE TO  CARRY  OUT 
THE

   RECOMMENDED INSPECTION/MAINTENANCE.   The 

guarantee  also becomes null and void if changes are made to 
the appliance without our knowledge, or if the serial number 
on the appliance is removed or made illegible.
The  annual  service  must  be  carried  out  by  a  competent 
installer in accordance with the advice given by Gledhill and 
using Gledhill approved parts.
(d) Stainless Steel Unvented Cylinders
Gledhill guarantee the components including controls, valves 
and electrical parts for two years from the date of purchase.  IT 
SHOULD BE NOTED THAT THE FACTORY FITTED TEMPERATURE 
AND  PRESSURE  RELIEF VALVE  MUST  NOT  BE  REMOVED  OR 
ALTERED IN ANY WAY OR THE GUARANTEE WILL NOT BE VALID.  
GLEDHILL WILL NOT BE RESPONSIBLE FOR ANY CONSEQUEN-
TIAL LOSS OR DAMAGE HOWEVER IT IS CAUSED. 
The guarantee for the stainless steel vessel is for twenty five 
years  if  the  original  unit  is  returned  to  us  AND  PROVIDED 
THAT:
(i)  It  has  been  installed  as  per  the  Design,  Installation  & 
Servicing  Instructions,  relevant  standards,  regulations  and 
codes of practice.
(ii)  It has not been modified, other than by Gledhill.
(iii) It has not been subjected to wrong or improper use or 
left uncared for.
(iv) It has only been used for the storage of potable water.
(v)  It has not been subjected to frost damage.
(vi) The benchmark log book is completed after each annual 
service.
(vii) The unit has been serviced annually.
It should be noted that the guarantee does not cover:
- the effects of scale build up
- any labour charges associated with replacing the unit or  parts.
If the stainless steel vessel proves to be defective either in 
materials or workmanship we reserve the right to either repair 
or supply replacements or the closest possible substitute in 
the case of any obsolete product and will collect and deliver 
to  any  address  in  England,  Scotland  and Wales  (excluding 
all islands):
(i) free of charge during the first year after delivery by us.
(ii)thereafter at a charge of one twenty fifth of the then cur-
rent list price during the second year after delivery by us and 
increasing by a further one twenty fifth on the second and 
subsequent anniversary of delivery by us.
ACTION IN THE EVENT OF FAILURE
If the Stainless Lite develops a leak we will ask for a deposit 
against the supply of a new one.  This will be refunded if the 
failure is within the terms of the warranty when it has been 
examined by us.
(e) Solar Panels and ancillary equipment
Gledhill provides a five year warranty for defects in the col-
lectors  (except  broken  glass  and  collector  accessories  eg 
metal edgings).  If the collector demonstrably fails to meet 
one of the requirements of the standard DIN 4757 part 3 we 
will replace it free of charge based on the date of invoice.  We 
can  not  be  responsible  for  damage  caused  by  mechanical 
stress and/or changes caused by weather related influences.  
The warranty  excludes minor surface damage that does not 
affect performance or malfunction due to improper assembly 
or installation.
Please note:
-  Installation must have been carried out by a licensed  special-

ized company (heating contractor or plumber) following the 
version of installation instructions in force.

- Gledhill or its representative was given the opportunity to 

check complaints on site immediately after any defect occurred.

-  Confirmation  exists  that  the  system  was  commissioned 

properly  and  that the system was checked and maintenance 
was performed annually by a specialised company licensed 
for this purpose.

AMD. MAY 2007

CONDITIONS OF SALE & WARRANTY TERMS

Summary of Contents for Xstream

Page 1: ...e most of Solar Technology Xstream an unvented domestic hot water cylinder Design Installation Instructions Tested by KIWA Evaluation Testing Centre and found to comply with the Building Regulations Please leave these instructions adjacent to the appliance ...

Page 2: ...MATTERS OF DESIGN SELECTION OR SPECIFICATION FOR THE EFFECTIVENESS OF AN INSTALLATION OR SYSTEM CONTAINING ONE OF OUR PRODUCTS UNLESS SPECIFICALLY REQUESTED TO DO SO IN WRITING All goods are sold subject to our Conditions of Sale which are set out at the rear of this specification In the interest of continuously improving the Xstream range Gledhill BuildingProductsLimitedreservetherighttomodifythe...

Page 3: ...ect way up in a dry place Any manual handling lifting operations will need to comply with the requirements of the Manual Handling Operations Regulations issued by the H S E The appliance can be moved using a sack truck on the rear face although care should be taken and the route should be even In apartment buildings containing a number of storeys we would recommend that the appliances are moved ve...

Page 4: ...temperature The twin tube design of Xstream overcomes this problem and therefore significantly reduces the risk of legionella Draindowniseffectedfromthevery bottom of both tubes Xstream is available in two basic variants 1 Xstream Direct For providing hot water heated by electricity Figure 1 2 Xstream Indirect For use with gas or oil boilers Figure 2 XSTREAM DIRECT Figure 1 Xstream direct is an el...

Page 5: ... combination inlet group 7 BSP F connection for drain valve not supplied 8 22mm copper connection for hot water supply Component kit supplied separately 1 Combinationvalveincorporatingpressure reducing valve strainer cold water connections expansion relief valve and check valve 2 Potable water expansion vessel 3 Tundish 4 Installation instructions s n o i t p O l e d o M t c e r i D 1 e l b a T l ...

Page 6: ... ISCHARGE PIPE 4UNDISH MMERSION IN 0RIMARY FLOW NTI VAC RELIEF VALVE OMBINATION INLET VALVE SET AINS PRESSURE COLD CONNECTION TO THE APPLIANCE AND PRESSURE GAUGE TEST POINT ALANCED COLD SUPPLY BAR IF REQUIRED AINS PRESSURE COLD SUPPPLY XPANSION RELIEF DISCHARGE TO RUN VERTICALLY AS FAR AS PRACTICAL XSTREAM INDIRECT Basic Appliance see Figure 2 1 Anti vacuum valve 2 Temperature and Pressure relief ...

Page 7: ...a v o m e r h t i w 3 4 0 4 V l l e w y e n o H m m 2 2 _ e v l a v e n o Z G T H d a e h e l b a v o m e r h t i w 3 4 0 4 V l l e w y e n o H m m 8 2 _ e v l a v e n o Z G T H 5 2 t a t e s y r o t c a f c i t a m o t u A p a m o C e v l a v s s a p y B e v l a v f e i l e r e r u s s e r P O R P M E O t e m l i Z S S F F t i k m e t s y s d e l a e s f o t r a p s a d e i l p p u s s l e s s e ...

Page 8: ...imum of 22mm usually in the form of a 25mm MDPE supply Theminimumrecommendedstaticpressureto operate an Xstream domestic system is 2 bar There should be a flow of at least 25 litres per minute or above available into the property Normally Xstream provides well in excess of 30 litres min in most conditions Flow rates for ALL mains pressure systems are subject to district pressures and system dynami...

Page 9: ...d supply must be shared between all terminal fittings It is important that a 22mm supply is brought to the appliance and a 22mm take off is continued at least to the bath If there are two baths 28mm pipework should be considered Smaller pipework or the use of flow restrictors should be considered for other outlets so as to balance the water available In any event the distribution pipework should g...

Page 10: ...COMBINATION INLET GROUP Combines elements 1 2 and 3 below 1 Pressure Reducing Valve This must be fixed near the cylinder The cold water supply terminal fittings in the property should be taken from the cold water tapping of this valve to ensure balanced hot and cold pressures This valve is factory set to ensure the correct operating pressure for the Xstream 2 Non Return Valve This is integral with...

Page 11: ...eatersarefittedtoalldirectmodelsandoneimmersionheaterisfitted to the indirect models Where it is intended that units are fitted to offpeak circuits then suitable controllers must be supplied External wiring to the immersion heaters must be in accordance with the relevant IEE Wiring Regulations and the circuit must be protected by a suitable fuse and a double pole isolating switch SAFETY The immers...

Page 12: ...lve must be wired so that they both switch off should an overheat situation develop It is important to follow the wiring diagram in the Wiring Section of these instructions SEALED PRIMARY CIRCUIT Any boiler used must be of a rated output of lessthan45kWandmustbefittedwithanover temperature cut out Unvented primary circuits may be filled or replenished by means of a temporary connection between the...

Page 13: ... E L SL N E L N E Pump L SL N E Pump 6 N Boiler t 7 E 8 L 9 N 10 E 11 L 12 SL 13 N 14 E R thermostat L 2 1 L 2 N 3 E 5 SL From pole isolator 230V 5A 50Hz 4 L L N E 15 L 16 N 18 L1 17 E 19 L2 20 L 21 N 23 L1 22 E 24 L2 HTG Zone valve brown grey blue orange g y HTG Zone valve brown grey blue orange g y HW Zone valve brown grey blue orange g y H brown grey blue orange g y L N E Heati C 1 C 1 HW ON HT...

Page 14: ... Models Ver 081003 230V 50Hz 5A L N E Double pole fused isolator Pump Room thermostat OH thermostat Control thermostat programmer HW zone valve HTG zone valve N L SL N Boiler HW HTG Honeywell dual tore thermostat L L N E Boiler Page 14 INSTALLATION ...

Page 15: ... GROUP Allow the cylinder to heat to normal working temperature with whatever heat source is to be used and check again for leaks The Pressure Relief Valve should not operate during the heating cycle Theboiler heatingsystemsshouldbefilledandcommissionedinaccordancewithgood practice following the guidance in BS 5449 the boiler manufacturers instructions NOTE This appliance is covered by BENCHMARK a...

Page 16: ...he immersion heaters are isolated from the mains before re setting the energy cut out If the immersion heater s need replacing this should be done with the units supplied from Gledhill Building Products Limited Same day despatch to approved installers can be arranged by telephoning 01253 474402 DISCHARGE FROM RELIEF VALVES If cold water is discharging from the expansion relief valve into the tundi...

Page 17: ... 4 p u o r g t e l n i n o i t a n i b m o C l l e w y e n o H 0 7 1 G X 4 e v l a v e n o z t r o p 2 m m 2 2 l l e w y e n o H 3 8 0 G X 5 l e s s e v n o i s n a p x e e r t i l 2 1 t e m l i Z 4 6 1 G X 6 l e s s e v n o i s n a p x e e r t i l 8 1 t e m l i Z 9 0 0 G X 7 l e s s e v n o i s n a p x e e r t i l 5 2 t e m l i Z 5 6 1 G X 8 h s i d n u T l l e w y e n o H 3 7 1 G X 9 e v l a v m...

Page 18: ...ors Ltd Haywood House 40 New Road Stourbridge West Midlands DY8 1PA Telephone 01384 442611 Fax 01384 442612 WATER SAVINGS OPTIONS FOR SHOWERS 4 FIXING OPTIONS FOR TAPS MIXERS 1 MK Range Combined Regulators Aerator for screwingontoTaps Mixerswithinternalorexternal threads on their noses Anti Vandal models also available 2 MR05 T Range Internal Regulators Push fit into TaporMixerseats Produced inthr...

Page 19: ...THE PRODUCT ACH APPLIANCE IS SUPPLIED WITH A PALLET WHICH HAS BEEN ATTACHED TO THE UNIT VIA THE PACKAGING 4HE PALLET WILL ALSO ALLOW FOR ONE OR TWO PERSONS TO GET A GOOD HOLD E 4AKING THE LEAD FOR TEAM LIFTS S MORE THAN ONE PERSON IS REQUIRED FOR THESE PRODUCTS ENSURE THAT ONE PERSON IS TAKING THE LEAD 4HIS MAY BE YOU SO ENSURE THAT EACH PERSON THAT IS HELPING IS MADE AWARE OF THE WEIGHT AND OF TH...

Page 20: ...and Tanks The copper storage vessel is guaranteed for ten years and if it proves to be defective either in materials or workmanship we will either repair or supply replacement at our option with the closest substitute in the case of any obsolete product to any address in Great Britain i free of all charge during the first year after delivery by us ii thereafter at a charge of one tenth of the then...

Page 21: ... ii all other goods the subject to of any other contract between the Purchaser and us which at the time of payment of the full price of the goods sold under this contract have been delivered to the Purchaser but not paid for in full c until property in the goods supplied hereunder passes to the Purchaser in accordance with paragraph 2 above i the Purchaser shall hold the goods in a fiduciary capac...

Page 22: ...Page 22 notes ...

Page 23: ...Page 23 notes Xstream ...

Page 24: ......

Reviews: