background image

Supplied By www.heating spares.co  Tel. 0161 620 6677

Page 38

Page 39

SY

STEMA

TE 

2000

1.   We  only  do  business  upon  the  Conditions  which  appear  below  and  no  other.    Unless  we  so  agree  in 
writing these Conditions shall apply in full to any supply of goods by us to the exclusion of any Conditions 
or terms sought to be imposed by any purchaser.  These Conditions of Sale and Warranty Terms override 
those  which  are  contained  on  the  Invoice  Forms  and  all  Sales  are  now  subject  to  these  Conditions  of 
Sale and Warranty terms only.

2.  PRICE
Orders  are  accepted  at  the  price  ruling  at  the  date  of  receipt  of  order,  this  price  is  our  last  published  list 
price plus a supplement to allow for any increase in the price of copper between the dates of publication of 
our price lists ("the copper price supplement").  An order may not be cancelled or varied after acceptance 
without  the  written  consent  of  the  company.    Such  cancellation  or  variation  shall  be  subject  to  such 
reasonable charges as may be appropriate.

3.  SPECIFICATION
The goods are supplied in accordance with the Specifications (if any) submitted to the Purchaser and any 
additions  and  alterations  shall  be  the  subject  of  an  extra  charge.    Any  goods  not  so  specified  shall  be 
in  accordance  with  our  printed  literature  or  the  literature  of  any  of  our  component  suppliers  (subject 
to  any  modifications  made  since  publication).    If  we  adopt  any  changes  in  construction  or  design  of 
the  goods,  or  in  the  specification  printed  in  our  literature,  the  Purchaser  shall  accept  the  goods  so 
changed in fulfilment of the order.

4.  PAYMENT
The invoice price of goods shall be payable within 30 days of despatch by us of our invoice for the goods or such 
longer time as may be stated by our quotation or invoice.  If we receive payment in full on or before the due 
date we will allow a discount of 5% except where we have quoted a special net price.  If payment is not received 
in full on or before the due date we shall be entitled in addition to the invoice price to:
(i)  payment of a sum equal to any increase in the copper price supplement applicable to the particular goods 
sold between the date of receipt of order and the date of receipt of payment in full; and 
(ii)  interest on any part of the invoice price unpaid after the due date at the rate of 3% per annum over the 
base rate for the time being of Midland Bank plc.

5.  TIME
We give estimates of delivery dates in good faith and time of delivery is not nor shall be made of the essence of 
any contract nor shall we be liable for any loss or damage occasioned by delay in delivery.

6.  DELIVERY
We deliver free normally by our own vehicles within 25 miles of any of our manufacturing depots.  Delivery to 
any place more than 25 miles from one of our manufacturing depots is subject to our quoted delivery charges.  
We reserve the right to make delivery of goods contained in one order by more than one consignment and at 
different times.  Where a period is agreed for delivery and such period is not extended by our Agreement, the 
Purchaser shall take delivery within that period.    If the Purchaser fails to take delivery, we shall be entitled 
at  the  Purchaser's  risk  and  expense  to  store  the  goods  at  the  Purchaser's  premises  or  elsewhere  and  to 
demand payment as if they had been despatched.  Offloading at point of delivery shall be the responsibility 
of and be undertaken by the Purchaser.

7.  SHORTAGES OR DAMAGE
Goods must be inspected before signature of delivery note and any damage, shortage or discrepancy noted on 
the delivery note and the goods returned on the same vehicle.  The buyer must also give us immediate written 
notice of the damage, shortage or discrepancy so that we may prompt investigation.

8. RETURN OF GOODS
Goods may not be returned to the Company except by prior written permission of an authorised officer of 
the Company and such return shall be subject to payment by the Purchaser of handling and re-stocking 
charges, transport and all other costs incurred by the Company.

 9. COMPANY LIABILITY
All  our  goods  are  made  of  the  best  materials  from  reputable  manufacturers  and  where  stated  are 
manufactured  to  the  appropriate  British  Standard.    Complaints  must  be  given  to  us  immediately,  before 
any  action  is  taken,  as  responsibility  cannot  be  accepted  if  repairs  or  renewals  are  attempted  on  site 
without our written authority.  

(1)  Domestic and Commercial Open Vented Cylinders and Tanks.
If  the  copper  cylinder  or  tank  or  any  integral  pipework  proves  to  be  defective  either  in  materials  or 
workmanship, we will either repair or supply replacement at our option with the closest substitute in the 
case of any obsolete product to any address in Great Britain.
(a)  free of all charge during the first year after delivery by us.
(b)  thereafter at a charge of one-tenth of the then current list price and any copper price supplement and 
delivery charge during the second year after delivery by us and increasing by a further one-tenth on the 
second and subsequent anniversary of delivery by us.
AND  FURTHER  we  will  meet  the  contractors/installers  reasonable  costs  in  removing  and  replacing  any 
defective Open Vented Copper Cylinder or Tank with defective integral pipework as follows:

Gledhill

 (Water Storage) 

Ltd

  

AMD. AUGUST 2000

Where  we  agree  to  rectify  any  defect,  we  reserve  the  right  to  undertake  the  work  on  our  own  premises.  
Provided that our product has been installed in accordance with any instructions for installation any any 
relevant codes of practice and in accordance with the bye-laws and requirements obtaining in any particular 
area we give the following warranties:

(i)  in the case of vessels of less than 80 imperial gallons capacity up to a maximum of one-half of the extent of 
our liability in regard to the replacement product expressed in (1) (a) and (b) above 
ii)  in the case of vessels larger than 79 imperial gallons capacity up to a maximum of one-quarter of the extent of 
our liability in regard to the replacement product as expressed in paragraphs (1) (a) and (b) above.

(2)   Domestic Mains Fed Products
 If the copper storage vessel itself or any integral pipework 
as part of the storage vessel assembly proves to be defective 
either in materials or workmanship, we reserve the right to 
either repair or supply replacements or the closest possible 
substitute  in  the  case  of  any  obsolete  product  and  will 
collect  and  deliver  to  any  address  in  England,  Wales  and 
Scotland (excluding all Scottish Islands).
(a)  free  of  all  charge  during  the  first  year  after  delivery 
by us.
(b) thereafter at a charge of one-fifth of the then current list 
price or any copper price supplement and delivery charge 
during the second year after delivery by us increasing by a 
further one-fifth on the second and subsequent anniversary 
of delivery by us.
AND  FURTHER  we  will  meet  the  contractors/installers 
reasonable costs in removing and replacing any defective 
copper  storage  vessel  or  storage  vessel  with  defective 
integral pipework from the Domestic Mains Pressure Range 
of products up to a maximum of one-third of the extent of 
our liability in regard to the replacement product expressed 
in (2) (a) and (b) above.
(3)    Components  of  our  products  other  than  Storage 
Vessels and Integral Pipework.  We will either extend to the 
purchaser the same terms of warranty as we are given by the 
manufacturer  of  the  component  or  if  the  manufacturer 
does  not  give  any  warranty,  replace  free  of  charge  any 
component which becomes defective within twelve months 
after the date of the delivery by us and is returned to us at 
the purchaser's expense but we shall not meet the cost of 
removal or shipping or return of the component or any other 
cost charges or damages incurred by the purchaser.
(4)  In the case of the Gulfstream range of products any heat 
generator found to be defective and admitted to be such 
by us either as regards materials or workmanship within 12 
months  from  date  of  installation  or  18  months  from  date 
of  manufacture  whichever  is  the  sooner,  will  be  repaired 
or replaced at our option.AND FURTHER we will meet the 
contractors/installers  reasonable  costs  in  removing  and 
replacing  any  defective  heat  generator  up  to  a  maximum 
of  one-third  of  the  extent  of  our  liability  in  regard  to  the 
replacement product.
(5)  In the case of goods manufactured solely in accordance 
with  our  specification  and  designs  and  in  respect  of  any 
installation work carried out by or on our behalf, our entire 
liability and the purchaser's sole remedies (subject to (1-4) 
above) and shall be as follows:
(a)  we  accept  liability  for  death  or  personal  injury  to  the 
extent  that  it  results  from  our  negligence  that  of  our 
employees agents or subcontractors.
(b)  subject  to  paragraph  (d)  below,  we  accept  liability  for 
direct physical damage to tangible property to the extent 
that such damage is caused by our negligence that of our 
employees agents or subcontractors.
(c) our total liability to the purchaser over and above any 
liability to replace under (1 - 4) above (whether in contract 
or in tort including negligence) in respect of any one cause 
of loss or damage claimed to result from any breach of our 
obligations  hereunder,  shall  be  limited  to  actual  money 
damages which shall not exceed £20,000 provided that such 
monetary limit shall not apply to any liability on the part of 
ourselves referred to in paragraph (a) above.
(d) except as provided in paragraph (a) above but otherwise 
notwithstanding any provision herein contained in no event 
shall we be liable for the following loss 
or damage howsoever caused and even if foreseeable by us 
or in our contemplation :-
(i) economic loss which shall include loss of profits, business 
revenue, goodwill or anticipated savings.
(ii) damages in respect of special indirect or consequential 
loss  or  damage  (other  than  death,  personal  injury  and 
damage to tangible property).
(iii)  any  claim  made  against  the  purchaser  by  any  other 
party
(save as expressly provided in paragraph (b) above).
(e) except in respect of our liability referred to in paragraph 
(a) above no claim may be made or action brought (whether 
in contract or in tort inluding negligence) by the purchaser in 
respect of any goods supplied by us more than one year after 
the date of the invoice for the relevant goods.

Summary of Contents for SysteMate 125

Page 1: ... SEALED CENTRAL HEATING AND MAINS PRESSURE HOT WATER SUPPLY SYSTEM INCORPORATING A THERMAL STORE ALL MODELS COMPLY WITH THE WATER HEATER MANUFACTURERS SPECIFICATION FOR HOT WATER ONLY THERMAL STORES SYSTEMATE 2000 SYSTEMATE 2000 Gas Council Approved Reference Numbers SysteMate 125 97 317 26 SysteMate 145 97 317 27 SysteMate 185 97 317 28 SysteMate 210 97 317 29 SysteMate 225 97 317 30 ...

Page 2: ...roduct is manufactured under a BS EN ISO 9002 Quality System audited by BSI Patents Pending TheGledhillGroup sfirstpriorityistogivea high quality service to our customers Quality is built into every Gledhill product and we hope you get satisfactory service from Gledhill If not please let us know As part of the industry wide Benchmark Initiative all Gledhill SysteMates now include a Benchmark Insta...

Page 3: ...y i e central heating system The SysteMate 2000 is not covered by section G3 of the current Building Regulations and is therefore not notifiable to Building Control The information in this manual is provided to assist generally in the selection of equipment The responsibility for the selection and specification of the equipment must however remain that of the customer and any Designers or Consulta...

Page 4: ...t temperature of the domestic hot water is maintained by a printed circuit board which controls the speed of the pump circulating the primary water from the store through the plate heat exchanger Because of the innovative method of hot water production no in line scale reducer is normally required on the cold supply to the appliance If scale should become a problem the plate heat exchanger is easi...

Page 5: ...o t p u e z i s r e l i o b x a M k 5 1 W k 0 2 W k 5 2 W k 0 3 W k 5 3 W h c t i w S W k 9 W k 9 W k 9 W k 9 W k 9 s e p y t g n i l l e w D l a c i p y T s m o o r d e B 3 1 3 2 4 2 5 3 6 4 s m o o r h t a B 1 1 2 1 2 2 3 4 r e w o h s e t i u s n E 1 2 1 4 2 4 2 0 1 2 TECHNICAL DATA Notes 1 The SysteMate 225 appliance is suitable for use in large properties because it produces the same peak hou...

Page 6: ...mplete with cold feed open vent pipework assembly is supplied separately Optional Extra Equipment A soft water model is available for areas where the hardness level is below 200 p p m mg ltr Flexible connection kit for use in connection with suitable push fit connectors for quick connection to first fix pipe installation Switch emergency electrical back up for hot water and or heating in the event...

Page 7: ...C 5 2 1 M S m m 0 4 1 1 m m 5 9 5 m m 5 9 5 5 4 1 M S m m 0 4 1 1 m m 5 9 5 m m 5 9 5 5 8 1 M S m m 0 5 3 1 m m 5 9 5 m m 5 9 5 0 1 2 M S m m 5 9 4 1 m m 5 9 5 m m 5 9 5 5 2 2 M S m m 0 7 6 1 m m 5 9 5 m m 5 9 5 S N O I S N E M I D D R A O B P U C M U M I N I M l e d o M t h g i e H h t d i W h t p e D F D E 5 2 1 M S m m 0 9 8 1 m m 0 0 7 m m 0 0 6 5 4 1 M S m m 0 9 8 1 m m 0 0 7 m m 0 0 6 5 8 1 ...

Page 8: ...Supplied By www heating spares co Tel 0161 620 6677 Page 8 1 0 DESIGN 1 2 TECHNICAL DATA ...

Page 9: ...ied By www heating spares co Tel 0161 620 6677 Page 9 SYSTEMATE 2000 1 2 TECHNICAL DATA PERFORMANCE GRAPHS OF GRUNDFOS PUMPS 1 0 DESIGN GRUNDFOS 15 50 GRUNDFOS 15 60 litres sec 6 litres sec Note 1mW G 10kPa ...

Page 10: ...he cold inlet should be removed No check valve or similar device should be fitted on the cold water supply branch to the SysteMate 2000 Because of the innovative method of hot water production no scale reducer is required on the branch to the appliance However to comply with the Benchmark Guidance Note for Water Treatment in Heating and Hot Water Systems the installer should check the hardness lev...

Page 11: ...at plastic pipework systems can be used in place of copper internally as long as the chosen system is recommended for use on domestic hot and cold water systems by the manufacturer and is installed fully in accordance with their recommendations This is particularly important in relation to use of push fit connections when using the optional flexible hose kits see 2 2 Installation Pipework connecti...

Page 12: ...be used for sizing the heating circuit pipework 1 3 SYSTEM DETAILS For example At 24 litres min primary flow rate the pressure loss through the SysteMate 2000 model SM210 coil and fittings is 2 1m W G 21kPa The maximum pump head available at 24 litres min and setting 3 is 3 2m H2 O 32kPa therefore 1 1m W G 11kPa is available for the boiler circuit With sealed heating systems air is released during...

Page 13: ... systems in this manual are generally based on the use of BS EN Standard copper pipework and fittings However we are happy that plastic pipework systems can be used in place of copper internally as long as the chosen system is recommended for use on domestic heating systems by the manufacturer and is installed fully in accordance with their recommendations We always recommend the use of barrier pi...

Page 14: ...uired at the lockshield valves on the radiators If this is not done the performance of the SysteMate will be adversely affected Heating System Connection of Bathroom Radiator Towel Rail for Summer use 1 0 DESIGN 1 3 SYSTEM DETAILS Boiler sited above the SysteMate or with dipped flow and return pipes A gravity check valve should be fitted in the boiler return pipework to prevent gravity circulation...

Page 15: ...reased load Full details of the requirements are provided in Section 2 1 Site Requirements and 2 2 Installation Otherwise the design requirements are the same as the standard appliance Switch can operate on hot water or hot water and heating modes In the former only hot water pump and electric heating element are energized In the latter the heating system pump is also energized This means that the...

Page 16: ...ble location will be needed for the separate feed and expansion cistern and expansion vessel This will often be at high level in the cupboard housing the SysteMate2000 Thedimensions and clearances are provided in section 1 2Technical Data The location will need to provide a suitable route for the cold feed expansion pipe and the open safety vent pipe for the appliance as well as the connecting pip...

Page 17: ... should be handled carefully to avoid damage and the recommended method is shown opposite Before installation the site requirements should be checked and confirmed as acceptable The plastic cover and protective wrapping should be removed from the appliance and the installation base provided placed in position The appliance can then be lifted into position in the cupboard on top of the base and the...

Page 18: ... Speedfit Yorkshire Tectite However as similar assurances cannot be obtained for Polypipe fittings we cannot recommend their use Connections A B D E F G H I and L are plain ended copper pipe Connections C J are compression fittings Connection K is a RC1 2 1 2 BSPT internal A Safety open vent B Cold feed expansion C Expansion vessel pipe D Central heating flow E Central heating return F Primary flo...

Page 19: ...lation in case they have been loosened during transit The fittings for the feed and expansion cistern should be installed following the instructions provided by the manufacturer in a position to suit the particular location and the cistern fitted on its supports base The cold feed expansion and safety open vent should be installed between the appliance and the feed and expansion cistern Combined f...

Page 20: ...plied By www heating spares co Tel 0161 620 6677 Page 20 WIRING DIAGRAM STANDARD SYSTEMATE 2000 APPLIANCE 2 0 INSTALLATION 2 2 INSTALLATION Y E K L B E U L B R B N W O R B Y G W O L L E Y N E E R G R D E R ...

Page 21: ... wiring panel ElectricalConnection StandardAppliance The SysteMate 2000 is pre wired to a 12 way terminal strip from the A C B and plumbers are well able to complete the electrical installation provided they adhere strictly to the IEE Requirements for Electrical Installations BS 7671 A schematic arrangement of the wiring is shown on page 24 All the terminals are suitably labelled Note Do not attem...

Page 22: ...ome loose during transit Frost Protection When frost protection is required for the whole house or where a base temperature is required during cold weather then a frost thermostat should be wired across plug in terminals 21 and 23 on the A C B board An alternative to fitting a frost thermostat would be to set the programmer to constant during the time required and adjust the room thermostat to a s...

Page 23: ...s co Tel 0161 620 6677 Page 23 SYSTEMATE 2000 2 0 INSTALLATION 2 2 INSTALLATION WIRING DIAGRAM SYSTEMATE2000 WITH SWITCH Y E K L B E U L B R B N W O R B Y G W O L L E Y N E E R G R D E R K L B K C A L B Y W O L L E Y H W E T I H W ...

Page 24: ... cable provided through the service slot provided in the base of appliance and connect to the isolator as follows red live black neutral green yellow earth Check the cables are secure in the grips provided below the terminal strip and ensure they are not in contact with any hot surfaces The recommendations contained under Electrical Connection Standard Appliance should be followed when connecting ...

Page 25: ...ails of the requirements are given in PAS 33 1999 under Section 10 Commissioning When using either cleansing or corrosion inhibitor chemical the manufacturers instructions must be followed Cleansing the Primary System It is very important to ensure that the Primary system is cleaned using a suitable cleansing agent such as Sentinel X300 or Fernox Superfloc to ensure that any flux residues installa...

Page 26: ...on the A C B shown opposite 1 Set the boiler thermostat to MAXIMUM 2 Switch off heating on the clock programmer and room thermostat 3 Check the jumper settings are correct Thesemustallbeinthecorrectpositions for the appliance to work correctly see opposite for options 4 Switch on the mains supply The A C B will automatically commission itself to suit the sytem boiler and the dot after the ON the L...

Page 27: ...d to be allowed for this to happen during initial commissioning This will vary depending on the boiler size and the model of the SysteMate 2000 being used 2 Once a temperature of 64 C has been reached on the thermal store switch on space heating clock programmer and room thermostat Horizontal LED bar 1 HT will light Green LED 3 on the A C B will switch on Heating pump will run 3 Switch off space h...

Page 28: ...ust the ballvalve so that the water level in the appliance F E cistern when the system is cold is correct and does not overflow when the appliance is at maximum temperature DO turn down the servicing valve for the ballvalve in the F E cistern once the system is finally filled to the point where the warning overflow pipe will cope with the discharge arising from a ballvalve failure DO make sure tha...

Page 29: ...obtained direct from Gledhill using the Speed Spares service or throughanyofthelargerplumbersmerchants specialist heating spares suppliers Help and advice is also available from the Technical Helpline on 01253 474401 However allcomponentsarereadilyaccessible and can be changed quickly and easily by the installer using common plumbing practice If it is necessary to replace any of the pumps fitted t...

Page 30: ... C A d r a o b l o r t n o c e c n a i l p p A k o l E 5 5 2 B X 8 5 1 9 3 E 1 1 r o s n e s e r o t S k o l E 9 4 1 T G 2 2 0 6 2 E 2 1 r o s n e s n r u t e r E H P k o l E 3 5 1 T G 4 2 0 6 2 E 3 1 r o s n e s e r u t a r e p m e t W H D k o l E 3 5 1 T G 4 2 0 6 2 E 4 1 k c o l c l a c i n a h c e m o r t c e l E n i l s s a r G 5 1 2 B X 3 7 8 5 8 3 5 1 k c o l c l a t i g i D n i l s s a r G...

Page 31: ...Supplied By www heating spares co Tel 0161 620 6677 Page 31 SYSTEMATE 2000 3 0 SERVICING ...

Page 32: ...he appliance F E cistern and vent the pump if necessary Water hammer loose pipework and or tap washers 2 Causes of Unsatisfactory Hot Water Service Check that the SysteMate is full of water i e level of water in the appliance F E cistern is correct when system is cold Check boiler thermostat this should be set at maximum Check that the boiler flow temperature is adequate when it stops firing Boile...

Page 33: ... visit from the manufacturer the installer must have the completed Benchmark commissioning service record sheet to hand to enable help to be provided InadditiontothemainLEDdisplaytheACBhas four green LED S which can be used to check a supply is being provided when required to the Boiler LED 1 Boiler pump LED 2 and Heating pump LED 3 LED 4 is not used on this appliance The following procedure shoul...

Page 34: ...ing Range In Line regulators as in Option 4 for Taps Mixers APPENDIX A WATER SAVINGS OPTIONS FOR SHOWERS 4 FIXING OPTIONS FOR TAPS MIXERS 1 MK Range Combined Regulators Aerator for screwing onto Taps Mixers with internal or external threads on their noses AntiVandal models also available 2 MR05 T Range Internal Regulators Push fit into Tap or Mixer seats Produced in three sizes 12 5mm BS1010 12mm ...

Page 35: ...d in another cupboard close to the appliance if required 0 5 0 P I M e d o C k c o t S 1 e p y t d l o f i n a M m o o r k a o l c e n o m o o r r e w o h s e t i u s n e e n o m o o r h t a b e n o r o t a l u g e r w o l F e t u n i m s e r t i l g n i t t i f l a n i m r e T s t e l t u o d l o f i n a m r e t a w t o H y t i t n a u Q s t e l t u o d l o f i n a m r e t a w d l o C y t i t n a...

Page 36: ... for plastic pipework in table 2 r e p p o c m m 5 1 n i h t g n e l e p i p t n e l a v i u q e m u m i x a M 1 e l b a T e r u s s e r p t e l n I r a b m e p i p f o h t n e l t n e l a v i u q e m u m i x a M m l 8 m l 0 1 m l 8 1 0 2 3 3 3 1 5 5 2 0 1 1 5 4 7 1 0 3 0 0 2 0 8 0 3 e p i p c i t s a l p n i s h t g n e l e p i p t n e l a v i u q e m u m i x a M 2 e l b a T e r u s s e r p t e l...

Page 37: ...ved and the actual connection of fittings to the manifold will need to suit the arrangements shown in page 35 Note 1 If it is proposed to fit chemical water treatment such as a water softener this should be fitted in this location and the cold water branch in the sink should be branched off the cold water main prior to the treatment device instead of the cold water manifold Any other isolating con...

Page 38: ... AND FURTHER we will meet the contractors installers reasonable costs in removing and replacing any defective Open Vented Copper Cylinder or Tank with defective integral pipework as follows Gledhill Water Storage Ltd AMD AUGUST 2000 Where we agree to rectify any defect we reserve the right to undertake the work on our own premises Provided that our product has been installed in accordance with any...

Page 39: ... to enter at any time any vehicle or premises owned or occupied by the Purchaser or in the possession of the Purchaser for the purposes of repossessing and recovering any such goods the property in which has remained in us under paragraph 2 above We shall not be responsible for and the Purchaser will indemnify us against liability in respect of damage caused to any vehicle or premises in such repo...

Page 40: ...Supplied By www heating spares co Tel 0161 620 6677 Page 40 ...

Page 41: ...Supplied By www heating spares co Tel 0161 620 6677 ...

Page 42: ...Supplied By www heating spares co Tel 0161 620 6677 ...

Page 43: ...Supplied By www heating spares co Tel 0161 620 6677 ...

Page 44: ...Supplied By www heating spares co Tel 0161 620 6677 ...

Reviews: