Page 30
PLATINUM PRE-PLUMBED
INSTALLATION
Electrical
Any electrical work shall be carried out by a suitably competent person fully in accordance
with the latest edition of the IEE requirements for electrical installations BS7671.
The appliance requires a suitable 230v AC mains supply rated at 5amp fed via a double-
pole linked isolator with a contact separation of 3mm in both poles. Details of how to
connect to the external wiring required (and the wiring provided) are shown below.
The 3kW immersion heater will require its own 230v AC mains supply. This shall be
rated at 16amp and fed via a double-pole linked isolator with a contact separation of
3mm in both poles. Details of how to wire the immersion heater are shown on page 16.
Both isolators shall be located immediately adjacent to the appliance and suitably
identified/labelled to allow safe use/maintenance.
The connections within the wiring centre are shown below.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
L
If compensator connec
ti
on required
N
wire to supply N terminals
N
L
N
N
PE
PE
3 core cable
PE
*SL2 IS ONLY FITTED FOR
LOGIC HEAT BOILERS WITH
PE
WEATHER COMPENSATION
If independent
ti
mes are required for each hea
tin
g zone
KITS FITTED
Use programmable room thermostats and
fi
t live link between terminal 9 and L or set
ti
mer CH to permanent ON
3 core cable
Ideal wired cylinder using Danfoss wiring centre WC4/B
HTG 1
HTG 2
ROOM THERMOSTATS
HTG 1
Cylinder pre-plumbed, 2-zone and with pump
fitt
ed
SUPPLY
SUPPLY
SL1 *SL2
TIMER
DHW OFF
DHW ON
HTG ON
DHW
DHW DUAL
AQUASTAT
HTG 2
PUMP
BOILER
Connec
ti
ons made by the installer
Summary of Contents for PLATINUM D120
Page 45: ...Page 45 NOTES ...
Page 46: ...Page 46 NOTES ...