Supplied By www.heating spares.co Tel. 0161 620 6677
The BoilerMate acts as the
neutral point of the system
and therefore the cold feed
and open vent must be piped
to the appropriate connections
on the BoilerMate.
A draining tap conforming to
he overflow/warning pipe
The sealed central heating system
the current issue of BS 2879,
must be provided at the
lowest point of the system,
which will allow the entire
central heating and hot water
system to be drained.
T
should be in 20mm internal
diameter pipe of suitable
material for use in heating
systems in accordance with
BS 5449 (such as copper). It
should have continuous fall
and discharge in a conspicuous external position. It should not have any other pipework directly branched
into it.
Boiler
BoilerMate
250mm
Highest point
of the system
Warning/Overflow pipe
Open vent
Cold feed
Mains
cold supply
•No bypass is required in the boiler circuit
•Bypass valve on heating circuit not required unless the heating
circuit incorporates 2-port zone valve or TRVs on all radiators
Diagram 3.7 Schematics of a BoilerMate heating system
Remote
F &E Cistern
Return
Flow
Boiler
BoilerMate
250mm
Highest point
of the system
Warning/Overflow pipe
Open vent
Cold feed
Mains
cold supply
•No bypass is required in the boiler circuit
•Bypass valve on heating circuit not required unless the heating
circuit incorporates 2-port zone valve or TRVs on all radiators
Diagram 3.7 Schematics of a BoilerMate heating system
Remote
F &E Cistern
Return
Flow
The height of the F & E cistern above the BoilerMate should not be greater than 10m and the water level in
the F & E cistern should be at least 450mm above the highest point on the system including the radiators
3.5.4. Gledhill SysteMate Heating System
The Gledhill Boiler is also suitable for
use with a Gledhill SysteMate; an
integrated sealed heating system
and mains pressure hot water
appliance The SysteMate uses an
indirectly heated open vented hot
water only primary store. The central
heating circuit is suitable for sealed
heating systems as shown
schematically in diagram 3.8. For
further details refer to Gledhill
SysteMate manual.
When using the boiler with a
SysteMate, the pressure safety valve
must be fitted on the boiler flow pipe
adjacent to the boiler. The expansion
vessel should be fitted adjacent to
the SysteMate and connected to the
connector on the SysteMate.
design and component selection and
sizing including filling arrangements
should follow the guidelines
discussed in section 3.5.2 ‘Sealed Heating Systems’.
Boiler
SysteMate
Open vent
Cold feed
Mains
cold supply
Diagram 3.8 Schematics of a SysteMate heating system
Remote F & E
Cistern for store
Heating circuit
expansion vessel
Return
Flow
Filling point (See diagrams 3.5 & 3.6)
Pressure gauge
Safety valve
Boiler
SysteMate
Open vent
Cold feed
Mains
cold supply
Diagram 3.8 Schematics of a SysteMate heating system
Remote F & E
Cistern for store
Heating circuit
expansion vessel
Return
Flow
Filling point (See diagrams 3.5 & 3.6)
Pressure gauge
Safety valve
Although the heating system is sealed, the primary store in the SysteMate must be filled via a feed and
expansion cistern supplied with the appliance as shown in diagram 3.8. The height of the F & E cistern
above the BoilerMate should not be greater than 10m.
VER: 02.3 _260505