background image

5

Preliminary Steps: 

Inspect the complete product when

opening the box to ensure that all parts are accounted for,

intact and void of any damage from shipping.

STEP A -- Assemble the Door:

a)  Stand the Glass door upright on a carpet or tarp 

cushion to protect the glass. Position with the inside of the

door facing out. Have the second installer support the

door during installation of these parts.

b) Install the Clear Vinyl Bumper on the handle side of the

door. Use a rubber mallet to tap into place. Trim even with

the glass top and bottom. ( See Detail A1 below) 

c) Install the Roller assembly in the top pre-drilled holes in

the door. The Roller is on the outside face of the glass with

the gaskets and plastic bushing between the metal parts

and the glass. The adjustment mechanism nut are in the

inside face. (See the Roller Assembly detail for parts 

assembly). (Reserve final adjustment of the roller 

assembly until after final installation of the door.)

d) Install the Bottom splash Guard on the door with the

flange facing to the inside. Trim even with the glass.

NOTE: Assembled door must be placed inside the shower

or tub before the fixed panel is finally installed. 

(see step 6.

Detail Roller Assembly

Outside of Enclosure

Detail Door Assembly

Detail #A1

(Close-up view Clear Vinyl Bumper 

on Glass Door)

LOCTITE 243 Blue

Medium Strength

(not provided 

with this unit)

LOCTITE 243 Blue

Medium Strength

Apply Threadlocker glue

Apply Threadlocker glue

(Close-up view Bottom Splash Guard

on Glass Door)

Summary of Contents for ACERO AS-48T-38

Page 1: ...d replacement parts or have installation questions and to report any damage contact our GlassCrafters customer service team at 888 683 1362 Monday thru Friday from 8 00 am to 5 00 pm EST Installation...

Page 2: ...TIONS Glasscrafters recommends the installation be performed by a trained installer Read the manual and become familiar with the steps involved in installation This product requires Two persons for sa...

Page 3: ...ller Limiter 15 Roller Assembly 13 Fixed Panel 2 Curb Dam End View 18 End Cap 17 Clear Vinyl Door Bumper 16 Clear Setting Blocks 7 Clear Plycarbonate Splash Guard 24 Clear H Vinyl 19 Plastic Wall Anch...

Page 4: ...encil Centerline Roller adjustment See page 13 Step 10 4 Installation Overview Showing steps for installation Refer to pages 6 15 for step by step installation descriptions 6 4 4 5 3 1 2 1 8 7 9 A 10...

Page 5: ...r is on the outside face of the glass with the gaskets and plastic bushing between the metal parts and the glass The adjustment mechanism nut are in the inside face See the Roller Assembly detail for...

Page 6: ...t of the Curb and mark a pencil line from front to back Extend the Centerline on the curb and mark a pencil line on the verti cal wall for the location of the vertical Wall Jamb 76 high unit 66 high u...

Page 7: ...into place Be sure that the thin plastic insert 11 for the glass is inside the Center Guide STEP 3 Install the Vertical Wall Jamb for the Fixed Panel a Position the Vertical Wall Jamb on top of the B...

Page 8: ...facing to the middle Temporarily tighten to hold in place Then slide the Horizontal Rail Mounting Wall Brackets fully on both ends of the Horizontal Rail and tighten into place Test t the assembly nex...

Page 9: ...ll amount of silicone sealant in the holes and inset the plastic anchors Screw the inner Wall Brackets into place using the 8 1 1 4 at head screws 22 d Assemble the Rollers on the Door The Anti Lift S...

Page 10: ...screw is completed in Step 10 after the roller adjustment procedure 7b Move the door to the closed position and then relocate the Door Stop Bumper to the proper location against the roller when the cl...

Page 11: ...ch end Wipe the base clean of all debris Clean surface with de natured alcohol Do Not remove the pencil marks for the outside of the Curb Dam The Curb Dam comes with Double Face Tape on the bottom pee...

Page 12: ...rom the inside STEP 9 Install the Clear H vinyl To install the H Clear Vinyl on the Door from the inside Begin at the bottom edge with the ange pointing to the space between the Door and the Fixed Pan...

Page 13: ...hold the assembly in position while loosening the locking nut as shown below with the 4mm Hex Wrench DETAIL 10 Using the 2mm Hex wrench turn the Roller on the Axel to lift and adjust the door for lev...

Page 14: ...ter handle Use vinyl gaskets and bushings to protect the glass Us the proper Hex L wrench to tighten the set screws in the outer Handle to x the Handle to the Door 14 DETAIL 11 Installing the Handle A...

Page 15: ...the seam between the Cover Plate and the U Channel as per the drawing and details 12 No sealant is required on the Center Guide Let cure for 24 hours before use End Cap Plastic Insert Splash Guard DE...

Page 16: ...ass panels An occasional wiping down on the glass panels an metal parts with a mild detergent diluted in water is all that is need to keep your Shower Tub enclosure looking brand new Acero Series Mode...

Reviews: