5
Preliminary Steps:
Inspect the complete product when
opening the box to ensure that all parts are accounted for,
intact and void of any damage from shipping.
STEP A -- Assemble the Door:
a) Stand the Glass door upright on a carpet or tarp
cushion to protect the glass. Position with the inside of the
door facing out. Have the second installer support the
door during installation of these parts.
b) Install the Clear Vinyl Bumper on the handle side of the
door. Use a rubber mallet to tap into place. Trim even with
the glass top and bottom. ( See Detail A1 below)
c) Install the Roller assembly in the top pre-drilled holes in
the door. The Roller is on the outside face of the glass with
the gaskets and plastic bushing between the metal parts
and the glass. The adjustment mechanism nut are in the
inside face. (See the Roller Assembly detail for parts
assembly). (Reserve final adjustment of the roller
assembly until after final installation of the door.)
d) Install the Bottom splash Guard on the door with the
flange facing to the inside. Trim even with the glass.
NOTE: Assembled door must be placed inside the shower
or tub before the fixed panel is finally installed.
(see step 6.
Detail Roller Assembly
Outside of Enclosure
Detail Door Assembly
Detail #A1
(Close-up view Clear Vinyl Bumper
on Glass Door)
LOCTITE 243 Blue
Medium Strength
(not provided
with this unit)
LOCTITE 243 Blue
Medium Strength
Apply Threadlocker glue
Apply Threadlocker glue
(Close-up view Bottom Splash Guard
on Glass Door)