9. A
ppendix
9.1
Project information form
Required information:
For starting up procedure
,
it is required to have following information:
- name of
lights
- color of
lights
- position of l
ights
- type of l
ights
(double or single)
- power supply of l
ights
Steps:
1. Navigation
and Signal Li
ghts
C
ontroller is installed and connected according
to
manual
2.
Switch
on power supply and
switch
on main unit
3. Make light configuration
4. Light check:
a)
Switch
on light.
b) Visually check light for operation
c) Compare position of light on ship with
graphic presentation
on main unit
d)
Switch
off light
5. Repeat step 4. for all lights
6. Simulate light failure for some lights by disconnecting light cable or removing bulb.
IMPORTANT!!! Dangerous voltages!!!
7. Check operation of external alarm output contact.
8. Check manual activation of some lights by switching them directly on
I
nput module.
9. Check NMEA communication with other systems. (if existing)
10. Fill-in project information given bellow and send configuration back to manufacturer
11. Save Configuration on USB and archive it.
OK
Ship name:
IMO no.:
Shipyard:
Hull no.:
Commisioning date:
Company:
Done by:
Main unit type ITNSL-01T
P
Power
S
upply
module
ITNSLP-01
P
Code
Input unit type ITNL
Input unit type ITNL
Input unit type IT
N
L
Input unit type IT
N
L
Serial no.
Input unit type IT
N
L
Input unit type IT
N
L
Touch Screen Navigation Light Controller
NL95
Summary of Contents for NL95
Page 1: ...Rev 4 Print date 2021 05 05 NL95 Touch Screen Navigational Light Controller NL95 User manual ...
Page 2: ...Rev 4 Print date 2021 05 05 NL95 ...
Page 42: ...Rev 4 Print date 2021 05 05 38 NL95 6 2 Configuration setup form ...
Page 51: ...Rev 4 Print date 2021 05 05 47 NL95 9 2 Configuration setup form ...