Page
15
of
49
C.
MOUNTING THE AWNING.
1. Lift the awning into position for fastening to the vehicle mounted brackets.
a. Ladders are usually sufficient; however, a scaffold or forklift may be used.
b. If using a forklift use all necessary caution to protect the surface of the
awning. Lift from the center of the awning to maintain product balance
while elevating.
2. Place the awning onto the brackets while feeding the motor power cable through
the hole. A small amount of lubricant may aid the feeding of the cable. Make
sure the grooves of the awning are securely engaged into the channels on the
bracket. (Figure 4)
(Figure 4)
3. Secure the awning by moving the slide locks along the bottom awning track until
they are located
under their respective brackets (Figure 5). The final position of the
slide lock should be directly under the shoulder of the arm.
Summary of Contents for GG750
Page 6: ...Page 6 of 49 98GC779 98GC1146C 98GC780B...
Page 7: ...Page 7 of 49 98GC104 98GC1063 98GC229 98GC783B 98GC781B...
Page 10: ...Page 10 of 49 Figure 1...
Page 12: ...Page 12 of 49 Figure 2...
Page 19: ...Page 19 of 49 C Motion Sensor 98GC779G and LED Connections 4 conductor power supply...
Page 22: ...Page 22 of 49...
Page 26: ...Page 26 of 49...
Page 28: ...Page 28 of 49 Motion Sensor Installation view Fig 4 Fig 5...
Page 29: ...Page 29 of 49 E Wiring Diagram Fig 6...
Page 35: ...Figure 12 Page 35 of 49...
Page 41: ...Figure 16 Figure 17 Page 41 of 49...
Page 47: ...Page 47 of 49...