26
Model: RT-5
Operation
4-08. Spit installation
Step 3
Use Jog button
to rotate Spits
Step 2
Place Bottom Grooved End into Right Spit Wheel
This section describes how to install the Spits. Always place a Spit through the Product before installing
the Spits into the Spit Wheel. (Note: Product to be cooked not shown in illustration)
Operator-side Door
Step 1
Place Pointed End through
Left Spit Wheel Holes
Operator-side Door
Summary of Contents for RT-5
Page 2: ......
Page 4: ......
Page 10: ...viii Model RT 5 Safety Notes ...
Page 14: ...4 Model RT 5 Introduction Notes ...
Page 22: ...12 Model RT 5 Installation Notes ...
Page 27: ...17 Model RT 5 Operation 4 Operation This section describes how to operate the unit ...
Page 44: ...34 Model RT 5 Operation Notes ...
Page 48: ...38 Model RT 5 Cleaning Notes ...
Page 52: ...42 Model RT 5 Troubleshooting Notes ...
Page 62: ...52 Model RT 5 Parts List 1 2 3A 3B 3C 3D 11 12 5 6 7 8 9 4 10 7 09 Blower Replacement 13 ...
Page 68: ...58 Model RT 5 Parts List Notes ...
Page 70: ...60 Model RT 5 Wiring Diagram 8 01 Wiring Diagram RT 5 208 240 60 1 WIRING DIAGRAM P N 33133 H ...
Page 72: ...62 Model RT 5 Wiring Diagram 8 02 Wiring Diagram RT 5 208 240 60 3 WIRING DIAGRAM P N 33127 J ...
Page 74: ...64 Model RT 5 Wiring Diagram 8 03 Wiring Diagram RT 5 230 50 1 WIRING DIAGRAM P N 35521 D ...
Page 76: ...66 Model RT 5 Wiring Diagram 8 04 Wiring Diagram RT 5 380 50 3 WIRING DIAGRAM P N 33573 G ...
Page 78: ...68 Model RT 5 Wiring Diagram 8 05 Wiring Diagram RT 5 415 50 3 WIRING DIAGRAM P N 37954 E ...
Page 80: ...70 Model RT 5 Wiring Diagram Notes ...
Page 81: ......