11
Model: RT-5
Installation
2-05.2.
Electrical Connections (Continued for previous page)
7.
Reinstall Side Cover and Probe Holders.
8.
Ensure all plastic ties holding Spits or Baskets and Spit Wheel Assembly have been removed.
9.
Turn Main Breaker on.
10.
Press the Power Switch to the ON
position. Verify the unit’s lights (Customer-side only) and the
controller illuminate. (Note: The Operator-side Door Light will only illuminate only when the heating
elements are on. The Customer-side Door Light is illuminated when the Power Switch is in the ON
position.)
1
1
Lights
Controller
Summary of Contents for RT-5
Page 2: ......
Page 4: ......
Page 10: ...viii Model RT 5 Safety Notes ...
Page 14: ...4 Model RT 5 Introduction Notes ...
Page 22: ...12 Model RT 5 Installation Notes ...
Page 27: ...17 Model RT 5 Operation 4 Operation This section describes how to operate the unit ...
Page 44: ...34 Model RT 5 Operation Notes ...
Page 48: ...38 Model RT 5 Cleaning Notes ...
Page 52: ...42 Model RT 5 Troubleshooting Notes ...
Page 62: ...52 Model RT 5 Parts List 1 2 3A 3B 3C 3D 11 12 5 6 7 8 9 4 10 7 09 Blower Replacement 13 ...
Page 68: ...58 Model RT 5 Parts List Notes ...
Page 70: ...60 Model RT 5 Wiring Diagram 8 01 Wiring Diagram RT 5 208 240 60 1 WIRING DIAGRAM P N 33133 H ...
Page 72: ...62 Model RT 5 Wiring Diagram 8 02 Wiring Diagram RT 5 208 240 60 3 WIRING DIAGRAM P N 33127 J ...
Page 74: ...64 Model RT 5 Wiring Diagram 8 03 Wiring Diagram RT 5 230 50 1 WIRING DIAGRAM P N 35521 D ...
Page 76: ...66 Model RT 5 Wiring Diagram 8 04 Wiring Diagram RT 5 380 50 3 WIRING DIAGRAM P N 33573 G ...
Page 78: ...68 Model RT 5 Wiring Diagram 8 05 Wiring Diagram RT 5 415 50 3 WIRING DIAGRAM P N 37954 E ...
Page 80: ...70 Model RT 5 Wiring Diagram Notes ...
Page 81: ......