12
Model: PO-VH & OVH-10
Installation
2-06.2.
Piping Installation
1.
Pipe shall be
3/8
” schedule 40 black iron, chrome plated or stainless steel.
2.
Pipe ends shall be reamed and blown clear of chips and scale before assembly. Inside of pipe and
fittings must be free of oil and dirt.
3.
Piping dimensions given are from center of fittings.
2-06.3.
Ansul System Elevation Drawing
See Section 2-05.6 for Parts List
Summary of Contents for OVH-10
Page 3: ......
Page 11: ...2 Model PO VH OVH 10 Introduction 1 4 Specifications 1 4 1 Overall Dimensions for PO VH UCM ...
Page 12: ...3 Model PO VH OVH 10 Introduction 1 4 2 Overall Dimensions for OVH 10 UCM ...
Page 27: ...Model PO VH OVH 10 Overview 18 3 01 Control Panel 6 5 4 3 2 1 Interlocking Start ILS Only ...
Page 33: ...24 Model PO VH OVH 10 Overview Notes ...
Page 45: ...Notes Operation Filter Maintenance Model PO VH OVH 10 36 ...
Page 53: ...44 Model PO VH OVH 10 Parts List 7 3 Filter Compartment PO VH Not shown UV Only 2 4 3 3 1 5 ...
Page 57: ...48 Model PO VH OVH 10 Parts List 7 5 Filter Compartment OVH 10 Not shown UV Only 2 4 3 3 1 5 ...
Page 59: ...50 Model PO VH OVH 10 Parts List Notes ...