
12
- Check and restore the earth insulation of the control unit line 19 and of the pump remote control
switch line 85.
YES go to 14
13
- Install the special tool between control unit and the injection system.
YES go to 15
Specific tooling
020481Y
Control unit interface wiring
14
- Delete the code and check from the beginning.
15
- Set the switch to "
ON
" with switch to "
RUN
"
and side stand raised. Wait more than two sec-
onds and check the following conditions:
19 - 23 = battery voltage
YES go to 16 NO go to 17
16
- Replace the control unit.
17
- Check the presence of voltage (+ batt.) be-
tween pin 86 of the pump remote control switch
and pin 23 of the control unit. Fix the wiring, if re-
quired. Check the relay coil continuity.
85 - 86 = 100 ± 50
Ω
18
- Check the efficiency of the 10 A fuse no. 2
YES go to 20 NO go to 19
Nexus 500
Injection
INJEC - 35
Summary of Contents for Nexus 500
Page 1: ...WORKSHOP MANUAL 633309 Nexus 500 ...
Page 4: ......
Page 6: ......
Page 7: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 21: ...INDEX OF TOPICS TOOLING TOOL ...
Page 33: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 50: ...Maintenance Nexus 500 MAIN 18 ...
Page 51: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 79: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 82: ...Engine from vehicle Nexus 500 ENG VE 4 ...
Page 83: ...INDEX OF TOPICS ENGINE ENG ...
Page 192: ...Oil pump cover screws 0 7 0 9 Engine Nexus 500 ENG 110 ...
Page 193: ...INDEX OF TOPICS INJECTION INJEC ...
Page 292: ...Injection Nexus 500 INJEC 100 ...
Page 293: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 311: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 329: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Page 339: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 359: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 363: ...INDEX OF TOPICS TIME TIME ...