MDE-5412C Passport® EDGE Installation and Start-up Manual · February 2019
Page 11
Passport EDGE Hardware Setup
The following templates are for a dual client setup using a customer display (8-Port):
41T-8- FRONT-EDGE-CD-BASIC-TRUNK
Port
V-LAN Segment
Device
1
Switch (Trunk) IN
MG
2
EDH
EDH
3
POS
TPOS (Server)
4
Auxiliary
Tablet 1
5
PayDev
PIN Pad 1
6
Auxiliary
Receipt Printer 1
7
Auxiliary
Customer Display 1
8
Switch (Trunk) Out To another switch
42T-8-FRONT-EDGE-CD-BASIC-2
ND
SWITCH
Port
V-LAN Segment
Device
1
Switch (Trunk) IN
From front/another switch
2
Auxiliary
Tablet 2
3
PayDev
PIN Pad 2
4
Auxiliary
Receipt Printer 2
5
Auxiliary
Customer Display 2
6
Not Used
Not Used
7
Auxiliary
Applause
8
PayDev
Dispensers
43T-8-FRONT-EDGE-CD-PAYMENT-TRUNK
Port
V-LAN Segment
DEVICE
1
Switch (Trunk) IN
MG
2
EDH
EDH
3
POS
TPOS (Server)
4
Auxiliary
Tablet 1
5
PayDev
PIN Pad 1
6
Auxiliary
Receipt Printer 1
7
Auxiliary
Customer Display 1
8
Switch (Trunk) Out
To another switch
44T-8-FRONT-EDGE-CD-PAYMENT-TRUNK-2
nd
SWITCH
Port
V-LAN Segment
Device
1
Switch (Trunk) IN
From front/another switch
2
Auxiliary
Tablet 2
3
PayDev
PIN Pad 2
4
Auxiliary
Receipt Printer 2
5
Auxiliary
Customer Display 2
6
PaymentZone
Payment
7
Auxiliary
Applause
8
PayDev
Dispensers