57
P U S H - T O - O P E N
© G h o s t C o n t r o l s 2 0 1 8
A. Confirm the newly programmed OPEN limit by pressing the remote transmitter button to activate the gate
and confirm the closed position has been set correctly. This limit is stored and remembered even when all of
the power sources are removed.
B. Repeat STEPS 16-18 if needed to change your desired OPEN position.
C. Test your system with the remote transmitter to make sure it opens and closes without errors.
POWERING THE SYSTEM WITH THE AC TRANSFORMER
NOTE
DO NOT USE THE AC TRANSFORMER AND SOLAR POWER AT THE SAME TIME!
STEP 18.
Route the AC transformer cable into the control box.
A. When wiring the AC Transformer you will need to insert the AC wires into the 18VAC TRSFMR SCREW
TERMINALS which are located on the PWR INPUT section of the main control board. Once inserted then
tighten each screw so that the wires do not come loose and fall out. The transformer is not polarity sensitive
so either wire can go to either transformer terminal.
Do not plug in the transformer during this step.
B. Connect AC Transformer to outdoor outlet. Make sure you connect AC Transformer wires to control board
prior to plugging in AC Transformer into weatherproof outdoor outlet.
C. Check that green LED (Power status) on top center of control board is on. This indicates that the battery is
being charged.
DO NOT PLUG IN THE AC
TRANSFORMER DURING THIS STEP.
DO NOT USE this terminal
if using AC Transformer
Black
Battery Harness
Operator Arm
Red
Summary of Contents for DTP1
Page 6: ...6 B L A N K P A G E ...
Page 8: ...8 B L A N K P A G E G h o s t C o n t r o l s 2 0 1 8 ...
Page 12: ...12 B L A N K P A G E G h o s t C o n t r o l s 2 0 1 8 ...
Page 18: ...18 B L A N K P A G E G h o s t C o n t r o l s 2 0 1 8 ...
Page 62: ...62 B L A N K P A G E G h o s t C o n t r o l s 2 0 1 8 ...
Page 67: ......
Page 68: ......