![GESTRA ZK 213 Original Installation Instructions Download Page 56](http://html.mh-extra.com/html/gestra/zk-213/zk-213_original-installation-instructions_2217873056.webp)
56
Align the central hole in the halves of the
coupling with the hole in the spindle.
Connect the coupling and spindle with the
hexagon head bolt (29).
Hand-tighten the nut (30) on the hexagon head
bolt (29).
Attention!
Equipment may not work properly or get
damaged if screws, nuts or bolts are
tightened with the wrong torques.
Apply the torques indicated in the
parts list when tightening screws, nuts
and bolts.
The tightening torques for your equipment are
indicated in the parts list.
Use the four hexagon head bolts (32) to screw
the two coupling halves together.
Fasten the hexagon nuts (31) on the hexagon
head bolts handtight.
Tighten the hexagon nuts (30) and (31) with the
specified torque.
Some equipment is fitted with a position
indicator. The position indicator comes
with a separate installation & operating
manual (IOM).
Mount the position indicator as described in the
IOM for the position indicator.