![GESTRA ZK 213 Original Installation Instructions Download Page 49](http://html.mh-extra.com/html/gestra/zk-213/zk-213_original-installation-instructions_2217873049.webp)
49
Fitting the insert
The mounting procedure for the insert is
the same for equipment with and
equipment without pressure balance.
The following drawing shows the
equipment without pressure balance.
Put the upper main gasket (17) into the body
(1.).
Push the insert (6) over the stem (12) and into
the body (2.).
Mounting the gland packing
The mounting procedure for the stuffing
box packing is the same for equipment
with and equipment without pressure
balance.
The following drawing shows the
equipment without pressure balance.
Attention!
Malfunctions may occur if the packing
rings are fitted incorrectly.
Make sure that the packing rings of
the stuffing box (15) are inserted in
the following order:
one wiper ring made from graphite and CrNi
pure graphite rings
one wiper ring made from graphite and CrNi
The number of pure graphite rings
depends on the size of the equipment.
The exact number is indicated in the
supplied parts list.
Attention!
Malfunctions may occur if the packing
rings are damaged.
Before installation discard and replace
any damaged packing rings.
Make sure that the packing rings are
correctly positioned and not damaged
or skewed when fitted.