![GESTRA ZK 213 Original Installation Instructions Download Page 15](http://html.mh-extra.com/html/gestra/zk-213/zk-213_original-installation-instructions_2217873015.webp)
15
Function
The equipment features a system of flash chambers
where the differential pressure is reduced in stages
and the flow is split up into many partial flows.
This decreases the noise level during operation and
dramatically extends the service life of the
equipment thanks to its high wear resistance.
The equipment is fitted with an externally actuated
stem. During the opening process the stem controls
the fluid flow by successively opening a series of
flash chambers.
When the stem is in the closed position the fluid
flow is completely stopped and bubble-tight closure
is ensured.
The tandem seat consists of a primary and a
secondary seat for double shut-off. When the
equipment is closed the stem (12) and plug (24) are
in the lowest position.
During the opening process first only the stem lifts
off. As a result of the reduced load the disc springs
(55) decompress.
Then the plug is lifted off its seat by the threaded
ring (22). The equipment is now open.